Recording opening
▶︎
0:10
PCA-2019-SU-003/CDPA-2019-SU-003/FDPA-2019-SU-003 (RZPA 2025-SU-0067)- BPR Ellipse LLC
▶︎
4:57
MOTION
▶︎
25:23
RZ-2025-MA-00020 and SEA-80-A-072-002-Versar Property Owner, LLC
▶︎
30:27
MOTION
▶︎
50:11
PA 2023-IV-MV3 (PA-2023-00044) (Concurrent with RZ 2025-MV-00022)-Penn Daw Fire Station, Emergency Shelter and Affordable Housing
▶︎
52:23
RZ 2025-MV-00022 (Concurrent with PA 2023-IV-MV3)- Board of Supervisors of Fairfax County, Virginia
▶︎
1:00:32
MOTION
▶︎
2:25:05
Planning action — PCA/CDPA/FDPA-2019-SU-003
Planning action — PCA_CDPA_FDPA-2019-SU-003.pdf
Planning action — RZ-2025-MA-00020 and SEA-80-A-072-002
Planning action — RZ-2025-MA-00020 and SEA-80-A-072-002.pdf
Planning action — PA 2023-IV-MV3 (PA-2023-00044) Concurrent with RZ-2025-MV-00022
Planning action — PA 2023-IV-MV3 (PA-2023-00044) Concurrent with RZ-2025-MV-00022.pdf
Recording opening
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
00:00:10
Well, good evening.
00:00:12
Welcome, everyone, to our March 25, 2026 planning commission meeting.
00:00:17
We open with commission business, including an announcement of a withdrawal of an application that was scheduled for tonight and an announcement of a committee meeting.
00:00:26
We will then convene three public hearings, one of which will be a combined plan amendment and rezoning.
00:00:33
Moving on to commission business, Commissioner Spain, you have an announcement of a withdrawal?
Evelyn S. Spain
Vice Chair, Planning Commission
00:00:39
Yes, I am sorry to announce that we would not be hearing the COSAF Emergency, Independent Emergency Department due to a withdrawal from the client.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
00:00:54
Thank you.
00:00:55
Or the applicant, excuse me.
00:00:56
Commissioner Sargeant, you have an announcement?
Timothy J. Sargeant
Member, Planning Commission
00:00:59
Thank you, Mr. Chairman.
00:01:00
The Planning Commission's CIP Committee will be meeting tomorrow evening, Thursday, March 26th, at 7.30 p.m.
00:01:08
The meeting will take place in Conference Room 11.
00:01:10
We will discuss the issues we have been discussing with the Planning Commission regarding CIP applications, and our next meeting of that will be April 8th, but tomorrow evening's meeting is in Conference Room 11.
00:01:22
at 7.30 p.m.
00:01:24
Thank you.
00:01:25
Thank you, Commissioner.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
00:01:25
Any other business commissioners?
00:01:29
Seeing no other business, we'll turn to Secretary Hancock for the order of tonight's agenda.
Jeremy Hancock
Secretary, Planning Commission
00:01:36
Thank you, Mr. Chairman.
00:01:37
We have three public hearings this evening.
00:01:39
The first is in the Sully District.
00:01:41
It is BPR Ellipse LLC, PCA 2019-SU-003-CDPA, also 2019-SU-003-CDPA.
00:01:55
3-FDPA-2029-SU-003, also RZPA 2025-SU-00067.
00:02:07
Our second hearing in the Mason District is SAR Property Owner LLC.
00:02:12
and application numbers RZ 2025-MA-00020 and SEA-80-A-072-002.
00:02:22
Our third public hearing in the Mount Vernon District, two applications concurrent.
00:02:30
Penndorf, Fire Station Emergency Shelter and Affordable Housing, PA 2023-4-MV3, also PA 2023-00044, and that is concurrent with RZ 2025-MV-00022, Board of Supervisors of Fairfax County, Virginia.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
00:02:59
Without objection, we will now move on to our three public hearings.
00:03:03
Seeing here, no objections.
00:03:07
Before we do so, let me start off welcoming those attending our meeting this evening in the auditorium or watching on TV or subsequently on video.
00:03:16
We invite and encourage the public to speak to the commission.
00:03:19
We have just a few ground rules that ensure that everyone is treated equally, and the commission hears from all who wish to be heard.
00:03:26
Individuals wishing to provide testimony to the commission have a number of options.
00:03:30
They can testify here in person or they can provide testimony by phone or by YouTube video.
00:03:36
At the designated point in the public hearing, I will call for speakers from our speakers list and they will either come forward or their video will be shown or they will be connected by telephone.
00:03:46
There will then be an opportunity for anyone else who would like to speak to the application to come down to the podium or to call in on a number that will be provided on the screen.
00:03:56
Speakers testifying via video must sign up and submit their video no later than 9 a.m. on the day prior to the hearing.
00:04:03
That would have been yesterday morning.
00:04:05
And for all in-person or telephone testimony, you are given four minutes to speak as an individual.
00:04:14
If you are a spokesperson for a group, you are given seven minutes.
00:04:18
All persons testifying by video will be given three minutes to speak.
00:04:22
Should you decide during the public hearing that you wish to be heard and did not previously sign up to do so, you will have three minutes to speak.
00:04:30
Finally, members of the public who wish to submit written testimony may do so electronically at any time prior to the closing of the public hearing.
00:04:38
In order to ensure timely distribution to the commissioners by the start of the public hearing, written testimony in digital form should be submitted no later than 1pm on the day of the public hearing.
00:04:51
So with that, our first public hearing.
00:04:54
is in Sully District.
PCA-2019-SU-003/CDPA-2019-SU-003/FDPA-2019-SU-003 (RZPA 2025-SU-0067)- BPR Ellipse LLC
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
00:04:57
This is BPR Ellipse LLC, PCA-2019-SU-003, SCDPA-2019-SU-003, and FDPA-2019-SU-003.
00:05:18
also RZPA 2025-SU-0067.
00:05:25
Commissioner Spain is our lead commissioner on this.
00:05:31
There is an affidavit with the applicant's representative.
00:05:34
Come forward, identify yourself for the record, and reaffirm your affidavit.
Lori R. Greenlief
Applicant or Nominator Representative
00:05:38
Good evening.
00:05:39
My name is Laurie Greenleaf with Maguire Woods, and I reaffirm the affidavit dated January 16th of this year.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
00:05:45
Thank you, Mr. Greenleaf.
00:05:46
May we have a staff report, please?
00:05:47
I think we have Mr. Shumate.
00:05:50
Good evening.
Carl Shumate
Planner
00:05:51
Good evening, Mr. Chairman, members of the Commission.
00:05:53
I'm Carl Shumate with the Department of Planning and Development.
00:05:57
The subject property, zoned PDC, is located within the ellipse at Westfields Development, just south of Dulles Airport, bounded by industrial three and five districts, and situated between the New Life Christian Church and the Fairfax County Criminal Justice Academy.
00:06:13
The extent of this PCA is highlighted in red, two blocks within the ellipse at Westfield's developments, which was approved by the board on March 9th, 2021.
00:06:23
The applicant wants to add an option to develop 16 single-family attached units shown on the right, instead of 10 condominium units with the first floor retail on the left, as leasing the retail component has not been successful so far since the original rezoning was approved.
00:06:40
This would increase the total residential units of the development from 374 to 380.
00:06:46
Of those six new units, three are WDUs and one is an ADU.
00:06:52
The required 44 parking spaces are exceeded by 14 with 58 total spots.
00:06:58
The open space area shown to the north of the subject property will slightly change, but the required open space of 15% would continue to be exceeded with the approved provision of 46% open space.
00:07:11
And overall, staff finds the proposal to be in conformance with the comprehensive plan and the zoning ordinance.
00:07:18
This concludes my presentation.
00:07:19
Thank you.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
00:07:20
Thank you, Mr. Shumate.
00:07:21
Ms. Greenleaf, do you have a presentation you would like to make?
Lori R. Greenlief
Applicant or Nominator Representative
00:07:26
I do, thank you.
00:07:33
Great.
00:07:34
Lori Greenleaf with McGuire Woods here on behalf of BPR Lips LLC, the applicant in this partial PCA.
00:07:40
I really don't have too much to add to the information that staff has already given you other than to say that shifting to a more residential focus for this one block was always envisioned with the original rezoning.
00:07:54
We do have a proffer that allows this conversion based on inability to rent the retail area.
00:08:04
This is a modest amendment.
00:08:06
It does respond to real market conditions and it's consistent with the comprehensive plan.
00:08:11
The increase in six residential units does fall within the recommended number of units in the comprehensive plan and will actually have a positive impact on traffic as the retail plus residential was anticipated to generate more traffic than these 16 townhomes would generate.
00:08:28
As staff has mentioned, four of the six additional will be affordable and workforce, helping to meet that critical need of for sale affordable dwellings.
00:08:39
The design and the orientation of these townhouses will match the other townhouses in the neighborhood.
00:08:45
As staff has already mentioned, we far exceed the urban park requirements, still far exceed.
00:08:50
We far exceed the open space with 10 sort of separate open space areas in this community.
00:08:56
There's no increase in impervious surface, so there's no change in the storm water management that was needed.
00:09:02
In closing, it's a straightforward application.
00:09:05
Ask for an option.
00:09:08
And staff is recommending approval.
00:09:10
We have a vote of no objection from the Transportation Land Use Committee of the Silly District Council.
00:09:16
And with that, respectfully request your recommendation of approval to the board.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
00:09:21
OK.
00:09:21
Thank you.
00:09:23
Questions from commissioners, starting with Commissioner Spain.
Evelyn S. Spain
Vice Chair, Planning Commission
00:09:26
Chair, I have no questions.
00:09:28
I would like to open up the floor to my colleagues.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
00:09:30
Commissioners, questions?
00:09:33
Sergeant Van Cortina.
Timothy J. Sargeant
Member, Planning Commission
00:09:36
Thank you, Mr. Chairman.
00:09:38
Just one clarification in terms of the additional units and parking, both on-street parking and garage parking.
00:09:44
I was wondering how that works with the additional units.
Lori R. Greenlief
Applicant or Nominator Representative
00:09:47
So the requirement for the 16 townhomes is 44 spaces.
00:09:51
We have 58 spaces.
00:09:52
There were 26 head-in spaces that are already constructed that was gonna serve the retail.
00:09:57
So for this little section, actually for the entire complex, we exceed the number of parking spaces because of that massive parking garage at Long and Foster.
00:10:06
But this block also exceeds the requirement.
Timothy J. Sargeant
Member, Planning Commission
00:10:11
Will that still provide for garage parking for the units as well?
Lori R. Greenlief
Applicant or Nominator Representative
00:10:15
Yes, there's garage parking and driveway parking.
Timothy J. Sargeant
Member, Planning Commission
00:10:18
Okay, great.
00:10:18
Thank you.
00:10:20
Commissioner Cortina?
Mary D. Cortina
Member, Planning Commission
00:10:22
First of all, I wanted to say that I don't object to this change.
00:10:28
I think that we foresaw that that would be the case because you have to have a certain number of units in an area to really support retail.
00:10:39
And that was brought up at the original hearing, the concern that this neighborhood, as many units as there are there, just couldn't support that retail.
00:10:51
And so I think we still are in a phase of struggling with getting the right mix of mixed-use, retail, residential.
00:11:02
But that said, and I appreciate that there will be affordable housing, so I think this is a good trade-off.
00:11:09
But I do have a question for staff.
00:11:12
And Billy, if this is something that you don't want to answer, that's fine if you can't answer.
00:11:18
But I do want to know because
00:11:20
When this application in 2021 first came to us, we asked the staff about the police academy that was next door.
00:11:30
And the police, as well as staff, said, oh, no, this is not a problem.
00:11:34
This is compatible.
00:11:35
This is doable.
00:11:37
And as soon as the neighbors started to move in, then this became a problem.
00:11:43
And we had to go find another location for the police academy.
00:11:50
What will become of this land now?
SPEAKER_03
00:11:57
This is William O'Donnell from the Department of Planning and Development.
00:12:01
I we haven't had any pre-application meetings for that site with this particular well with the previous approved application we tried to get as much buffering as possible on the two there's two boundaries that two shared boundaries and we I think I want to say at least got 25 feet of buffering but
00:12:25
Yeah, we haven't had any pre-apps or I haven't heard of anything wanting to come in and redevelop that one corner.
00:12:33
It is a prominent corner next to, was it Lee Road and Willard, so I'm imagining something could definitely come.
Mary D. Cortina
Member, Planning Commission
00:12:41
And well, I would just like to encourage staff to think about the planning, doing a plan amendment for this area, because if it is no longer viable for the police, then, you know, we do have a process for putting in public facilities into the comprehensive plan in an orderly way that we can all plan for.
00:13:03
And this always felt a little bit, you know,
00:13:09
unfortunate because it sort of forced the issue of the police having to move.
00:13:17
But nevertheless, they were running out of space, et cetera, anyway.
00:13:22
And to me, I think we should just not leave this to some other opportunistic, you know, something that comes along and actually put it into planning.
00:13:37
for the public facilities, for the bonds, et cetera.
00:13:43
But that's my only comment on this.
00:13:45
But in terms of changing it, I think that's a good idea and it would be good to use this other area for housing rather than to have a police academy next door.
00:13:57
Thank you.
Jeremy Hancock
Secretary, Planning Commission
00:13:58
Thank you.
00:13:59
Commissioner Hancock.
00:14:01
Thank you.
00:14:02
Remind me, on the current proposal, there's a sunset on the retail?
00:14:05
Is there a time limit that you're asking to be reduced for that option?
Lori R. Greenlief
Applicant or Nominator Representative
00:14:09
The original proffer said two years of trying to obtain a retail lease.
00:14:16
So we are expediting that time frame.
00:14:20
We're also asking to change the type of unit.
00:14:22
What was approved, there were 10 condos above the retail.
00:14:26
And what we'd rather do are the townhouses, like what's around it.
00:14:32
As I mentioned, they spoke to retail brokers.
00:14:35
There was absolutely no appetite.
00:14:36
There was not even an appetite from builders to build the building.
00:14:41
I mean, the applicant even asked builders about building it, selling it back to the applicant.
00:14:46
And the applicant would be leasing, and that wasn't even, there was no appetite for that either.
Jeremy Hancock
Secretary, Planning Commission
00:14:51
So just to,
00:14:54
I'll clarify.
00:14:55
So the concern here about switching, I don't have an issue.
00:14:58
I think the opportunity here for more housing is good with me.
00:15:04
So there was also an issue with sort of like getting the builder or someone to do that.
00:15:08
So you're leaving.
00:15:09
So I guess that option will remain to move that forward.
00:15:13
It will.
00:15:14
I will say, and seeing other applications, retail is hard.
00:15:18
This area I can understand particularly hard.
00:15:22
I do think we need to think about what's the purpose of that retail.
00:15:26
It's not just having retail.
00:15:27
It's the engagement with the community.
00:15:29
I'm not going to push on this hard.
00:15:33
I think that there was some consideration originally that this would convert to housing.
00:15:38
And so it seems more appropriate.
00:15:39
But generally, I do think we need to think about if we're removing retail, if retail is going to be harder,
00:15:46
What's the purpose of that originally and how are we meeting that larger community purpose?
00:15:52
I think there's trade-offs here, right?
00:15:54
We get more housing, but we're missing out on that community engagement.
00:16:01
So just a broader comment, not necessarily specific to this, but it's something that we'll have to think about as these more retail issues come forward.
00:16:11
Thank you.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
00:16:12
Thank you.
00:16:13
Anyone else?
00:16:14
I wanted to follow up on that, Ms. Greenleaf.
00:16:17
So I get it.
00:16:19
Maybe it was the apple was too big to bite, whatever.
00:16:24
That's a poor analogy.
Lori R. Greenlief
Applicant or Nominator Representative
00:16:26
I think it was too small.
00:16:27
Too small.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
00:16:29
So anyway, what I want to get at is we have an interest in retail in a mixed-use context.
00:16:36
to support, this is picking up on Commissioner Hancock's point, but to support an evolving neighborhood.
00:16:44
What we'll lose by putting housing here is, as that area further evolves, the option for retail is gone.
00:16:52
My question to you is, was there an effort made to size the retail in a way that would make it more attractive for a use?
00:17:04
Say, for example, a coffee shop, something that the residents would benefit from having nearby.
Lori R. Greenlief
Applicant or Nominator Representative
00:17:11
That was the original intent, some type of coffee shop or amenity for the residents.
00:17:17
But again, there was no appetite for that because retail really does want to be on a main road.
00:17:24
And as Commissioner Cortina mentioned, there's not enough residential around there.
00:17:31
If you recall, this was sort of a companion application with Albemarle, which was next door.
00:17:37
That has a 300 or 350 unit multifamily building going in.
00:17:45
And then those leave some of those warehousing buildings there.
00:17:49
So there might be some opportunities there once more residents are there for more retail to come.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
00:17:56
I'm just concerned about raising expectations for the residents themselves.
00:18:00
And then we had this experience with the Vienna metro area where the residents came to expect a certain level of retail activity and so far there's none of that and perhaps there won't be any of that.
00:18:19
So I guess I'm speaking to the question of raising expectations
00:18:27
that apparently no one ever expected to realize.
Lori R. Greenlief
Applicant or Nominator Representative
00:18:32
Well, I think from the developer standpoint, the fact that we had the proffer showed that we were a little iffy on the retail to begin with.
00:18:41
I did see the emails from the neighbors who were expecting a coffee shop and whatnot, and the best I can do is say that we tried that.
00:18:51
We tried to
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
00:18:53
And it's hard for us, of course, to gauge what that level of effort is.
00:18:57
We just have to take your word that there was the outreach and no one was interested.
00:19:02
There's no metric that we can help to kind of hold you accountable to that proper.
00:19:07
That said, housing is a good thing at this point, but maybe it's a cautionary tale.
00:19:14
We should be much more attuned to
00:19:20
what the real prospects are for retail.
00:19:23
Again, I don't want to have us be raising expectations of future residents that we apparently know ahead of time is not going to be met.
00:19:32
It's unfair to the new residents.
00:19:35
Thank you, Mr. Chairman.
Timothy J. Sargeant
Member, Planning Commission
00:19:39
Now that they've turned the lights on, I have another question.
00:19:43
And this is more for staff.
00:19:45
We've seen this occur with other applications recently in other areas, and I'm wondering if we are, you know, seeing a trend, and I'd appreciate, not tonight, but I'd appreciate some thoughts from staff in terms of planning horizons and whether this is the kind of trend we should be aware of.
00:20:04
if indeed this is what's occurring because we have had this as I've mentioned with other applications too.
00:20:09
And I'm sure there was an earnest effort to try and get that kind of community serving coffee shop or other facilities in there.
00:20:19
So I think we should just have a little thoughts about whether this is something we have to look for for the future.
00:20:27
Thank you.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
00:20:29
Thank you.
00:20:30
If I could piggyback on that one more time.
00:20:32
Again, for future consideration, if we know that there is a level of development that's required to support even a modest retail establishment,
00:20:47
Do we know what that is?
00:20:51
For example, you referenced the development that could be taking place, 300 plus units.
00:20:56
Would that be a threshold over which then a retail could be, a small coffee shop could be viable?
Lori R. Greenlief
Applicant or Nominator Representative
00:21:08
I don't know what that threshold is, but I know it also has a lot to do with location.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
00:21:13
Yeah, it would be resident serving more than bringing the public in.
00:21:19
I understand that.
00:21:21
All right, we won't beat that horse any longer.
00:21:24
Commissioner Cortina?
Mary D. Cortina
Member, Planning Commission
00:21:27
One more beating of the horse.
00:21:31
So how many units are in this development?
Lori R. Greenlief
Applicant or Nominator Representative
00:21:34
This will be 380.
Mary D. Cortina
Member, Planning Commission
00:21:36
and then the other 300.
Lori R. Greenlief
Applicant or Nominator Representative
00:21:37
The total, I think it's 300 because the total between the two was 700 based on the comprehensive plan.
Mary D. Cortina
Member, Planning Commission
00:21:44
And for whatever odd reason, I do remember this application clearly.
00:21:49
And the discussion was that we needed 2100 units, that there was some metric out there that basically in order to support community serving retail, you needed 2100 units that were
00:22:05
Either nearby, walking distance, that type for somebody to come and move in.
00:22:11
And this was an isolated kind of an area that didn't have that, which was why they wanted to be able to add it.
00:22:19
But it was a consideration that this was a little concerning to put this community here with really nothing else nearby.
00:22:30
to walk to, and so it was probably a little wishful thinking.
00:22:33
But in terms of planning, I think it would be helpful to get that metric if that was from the Urban Institute or how we can drill into that a little bit more rather than just a knee-jerk reaction of let's put mixed use and how do we really build that into something viable.
00:22:56
And at what phase does that come along?
Lori R. Greenlief
Applicant or Nominator Representative
00:23:00
I will tell you, as an aside, we're representing several developers at the Herndon Metro.
00:23:07
And the amount of retail going in there is minuscule.
00:23:10
And that's at Metro.
00:23:12
And that's 9,000 square feet, something like that.
00:23:16
And that's a TOD.
00:23:19
And it's still pretty small, so for what it's worth.
00:23:22
Thank you.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
00:23:24
Commissioner Carter?
John A. Carter
Member, Planning Commission
00:23:27
I wasn't going to say much, but I think we know.
00:23:30
2021 is a long time ago, especially in the life of retail.
00:23:36
And we know that retail has changed.
00:23:39
We know we've seen several projects here.
00:23:43
The amount that these internal retail on an internal project is super challenged and we should probably be very careful and you look at this one and it is interior to expect the townhouses to really generate enough
00:24:01
At this point in time, maybe 2021, we thought it was okay, but today, it's not enough.
00:24:10
We also know the size of townhouses is probably not conducive to retail, even the small retail, like the shops.
00:24:21
A better location, I think, is part of this.
00:24:24
But I think the size also is part of this.
00:24:29
And we've seen a lot of this in the last five years.
00:24:34
And I think we know more than we think about the success of retail.
00:24:39
So I think this was in 2025, in 2026, probably that we probably would have done something different, I think.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
00:24:50
OK.
00:24:50
Thank you, Commissioner Spain.
00:24:51
Anything else before we move to the public hearing?
Timothy J. Sargeant
Member, Planning Commission
00:24:54
How many questions are there?
00:24:57
No, I have no questions.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
00:24:59
Well, this is a public hearing.
00:25:00
We have no list of speakers.
00:25:02
Is there anyone here in the auditorium who wishes to speak to this application?
SPEAKER_00
00:25:07
Seeing no one, is there anyone on the phone?
00:25:09
There are no callers.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
00:25:11
Thank you.
00:25:12
So we'll move to closing comments from staff.
00:25:15
Mr. Shumate, closing comments from the applicant?
00:25:17
Nothing.
00:25:18
Commissioners?
00:25:19
Nothing.
00:25:19
So I'll now close the public hearing and recognize Commissioner Spain for a motion.
MOTION
Evelyn S. Spain
Vice Chair, Planning Commission
00:25:23
Yes, thank you, Chair.
00:25:26
In listening to my fellow commissioners, they've raised some excellent comments about how we will move forward to ensuring that when an applicant says they're going to build retail within their development, that there is truly an opportunity that will be met.
00:25:45
It's unfortunate in this instance, like we started out in 2021, we had no idea
00:25:51
That was like pre-COVID while COVID was going on.
00:25:54
There were a lot of things going on.
00:25:56
And we thought that the applicant thought that there would be ample reason for having retail in this mixed use environment.
00:26:06
With that said, though, I think we have some lessons learned moving forward.
00:26:11
And perhaps we could look at other developments that have been successful at including retail within their mixed use development.
00:26:20
As Commissioner Carter pointed out, we have the metric, and so now we need to take a deeper dive to make sure that something like this doesn't happen again.
00:26:31
We appreciate the applicant doing the proffer, but we want to make sure that we've exhausted all alternatives before we have to repeat this again.
00:26:43
So with that, as outlined in the application,
00:26:48
PR Ellipse LLC is requesting an amendment to RZ-FDP 2019-SU003.
00:26:58
This amendment aims to modify a portion of the property that was previously approved for mixed use development by replacing two previously sanctioned residential condominiums with a total of 10 units.
00:27:16
along with the first floor retail space.
00:27:20
According to the original proffer, the applicant intended to utilize the retail space for residential purposes only after making diligent and earnest efforts to lease it.
00:27:33
Of the six newly proposed units, BPR ellipse indicates that three will be workforce dwelling and include one that is designated to be affordable housing.
00:27:46
There are no concerns regarding a reduction in the open and park spaces as the development continues to exceed the approved provision of 46% open space.
00:27:59
We have received a number of letters expressing concern about potential parking issues.
00:28:07
In response, the applicant has collaborated with staff to the revised comprehensive development plan amendment
00:28:16
and the final development plan amendment to improve pedestrian comfort along private street E. This has been achieved by incorporating a larger landscape buffer between the proposed sidewalk and existing surface parking spaces.
00:28:34
At this time, there are no issues that have been identified with this approach.
00:28:39
So with that, Commissioner, Chairman, I am ready to make my motion.
00:28:47
Chairman, I request that the applicant confirm for the record their agreement to the development conditions dated March 12, 2026.
Lori R. Greenlief
Applicant or Nominator Representative
00:28:56
On behalf of the applicant, we agree with those development conditions.
Evelyn S. Spain
Vice Chair, Planning Commission
00:29:02
Thank you.
Lori R. Greenlief
Applicant or Nominator Representative
00:29:03
Dated March 12, 2026.
Evelyn S. Spain
Vice Chair, Planning Commission
00:29:05
Thank you.
00:29:08
I have three motions.
00:29:11
I move that before we do the final approval or rejection,
00:29:15
I move that the Planning Commission recommend to the Board of Supervisors approval of PCA 2019-SU-003 and the Concurrent Conceptual Development Plan Amendment, subject to the proffers consistent with those dated February 17, 2026.
00:29:37
I also move that the Planning Commission approve FDPA-2019-SU-003, subject to the development conditions dated March 12, 2026 and the Board's approval of the concurrent PCA application.
00:29:56
Finally, I further move that the Planning Commission
00:30:01
recommend to the Board of Supervisors approval of waivers and modifications listed on the staff report cover.
Timothy J. Sargeant
Member, Planning Commission
00:30:10
Second.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
00:30:11
It's been moved by Commissioner Spain, seconded by Commissioner Sargeant.
00:30:13
Is there any discussion?
00:30:14
Hearing no discussion, all those in favor signify by saying aye.
00:30:18
Aye.
00:30:18
Opposed, nay.
00:30:20
Any abstention?
00:30:20
That motion carries.
Evelyn S. Spain
Vice Chair, Planning Commission
00:30:22
Thank you.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
00:30:24
Thank you.
00:30:24
We'll move on to our next public hearing.
RZ-2025-MA-00020 and SEA-80-A-072-002-Versar Property Owner, LLC
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
00:30:27
This is in Mason District, Versar Property Owner, LLC.
00:30:31
This is RZ-2025-MA-00020.
00:30:37
and SCA-80-A-072-002.
00:30:42
This is in Mason District and Commissioner Wang is our lead for this.
00:30:48
Are there any, let's see, we do have an affidavit for this.
00:30:53
Would the representative of the applicant please come forward to identify yourself for the record and reaffirm your affidavit.
00:30:58
Mr. Schneider.
David I. Schneider
Applicant or Nominator Representative
00:30:59
Mr. Chairman, commissioners, David Schneider from the law firm Holland and Knight here on behalf of the applicant and reaffirm the affidavits dated February 12, 2026.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
00:31:07
Thank you.
00:31:07
Are there any disclosures from the Commission?
00:31:09
Seeing and hearing no disclosures, may we have a staff report, please?
00:31:13
Ms. Williams, welcome.
Sharon Williams
Planner
00:31:15
Thank you so much.
00:31:17
Good evening, Mr. Chairman and members of the Planning Commission.
00:31:19
My name is Sharon Williams, and I'm with the Department of Planning and Development.
00:31:22
With me tonight is my colleague Heather Springs, also with the Department of Planning and Development.
00:31:28
This application proposes a rezoning from the I-5 district to the C-8 district to permit vehicle sales, rental, and service establishment, and a concurrent special exception amendment is proposed to permit that vehicle sales establishment
00:31:41
and also to permit sign modifications on site and to carry forward the previously approved uses in a floodplain.
00:31:49
The 15.67-acre subject property consists of two parcels, parcels 22A and 22B, and it's located at 6800 and 6850 Versailles Center between Interstate 495 and the Virginia Railway Express, adjacent to the I-395-495 interchange.
00:32:07
It's located within the Beltway South industrial area of the comprehensive plan and it's zoned I-5.
00:32:12
Currently there's two four-story office buildings with a gross floor area of 105,000 square feet and 119,794 square feet respectively and a four-story parking garage on the property.
00:32:26
Telecommunication Tower is also located on the eastern edge of the property.
00:32:31
Floodplain, resource protection area, and environmental quality corridor run through the subject property in the middle between the office buildings, and a bridge runs through those environmentally sensitive areas on site to provide access to lot 22B.
00:32:45
As mentioned, this applicant is proposing a rezoning and a special exception amendment to permit a vehicle sales rental and service establishment.
00:32:53
The applicant proposes to generally maintain the existing layout with reduced building footprints on site.
00:32:58
The existing office buildings will be demolished and replaced with the vehicle sales rental and service establishment, but the existing parking garage is proposed to be retained for vehicle storage.
00:33:07
The proposed use will be divided into two buildings with one building proposed on each parcel.
00:33:13
A 15,250 square foot sales and delivery building is proposed on lot 22A and a 39,500 square foot service building is proposed on lot 22B.
00:33:23
Both of the proposed buildings would have a maximum height of 40 feet.
00:33:27
Surface parking and vehicle storage is proposed on both lots surrounding the buildings, and the total gross floor area on the entire site would be 54,750 square feet, equating to an overall 0.08 FAR.
00:33:41
The applicant proposes to provide 171,071 square feet of 10-year tree canopy coverage on site,
00:33:49
via True Plantings and True Preservation.
00:33:52
In addition, this applicant proposes to reduce the previously approved limits of disturbance and encroachments into the RPA and restore almost 61% or 23,536 square feet of RPA on site.
00:34:06
And this applicant also proposes to carry forward the previously approved uses in a floodplain, though there are no new encroachments into the floodplain proposed on the site.
00:34:16
The applicant is also proposing sign modifications, specifically the request to increase the building-mounted sign area on the proposed buildings and to permit additional freestanding signs on site to allow for easier wayfinding for future customers and increased site visibility for the vehicle sales establishment.
00:34:33
The total sign area allowed by right by Article 7 of the zoning ordinance, including freestanding and building mounted signage, is 640 square feet.
00:34:41
This applicant is requesting 1,712 square feet of total signage, which is 1,072 square feet of additional sign area above the maximum permitted by the ordinance.
00:34:53
But of that proposed sign area, 800 square feet, or 46.7%, is proposed for temporary signage.
00:35:00
which is only allowed on site for 24 months from the start of display and staff has also proposed a development condition to limit the number of temporary signage to two signs for up to 24 months.
00:35:14
The applicant is requesting 27 freestanding signs on site where the ordinance limits freestanding signs to a maximum of two.
00:35:21
The applicant is seeking flexibility in the number of proposed freestanding signs because they are not sure how many might be needed by the end user and staff supports that flexibility but has encouraged the applicant to limit the number of pole-mounted signs clustered in close proximity to reduce potential visual clutter.
00:35:38
Shown here are the architectural renderings for the building.
00:35:41
The plans depict each building to be constructed with a combination of concrete panel, composite metal panels, and aluminum composite panels.
00:35:49
And overall, staff finds that the proposed rezoning and special exception amendment is in conformance with the comprehensive plan and the applicable zoning ordinance provisions.
00:35:56
And as such, staff recommends the approval of these two applications, subject to the execution of proffers dated March 10th, 2026, and the proposed development conditions dated March 12th, 2026.
00:36:07
Thank you so much.
00:36:08
This concludes my presentation.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
00:36:10
Thank you, Ms. Williams.
00:36:11
Is there a board hearing date on this yet?
David I. Schneider
Applicant or Nominator Representative
00:36:15
I don't believe there is, no, there's not.
00:36:31
Ms. Williams and Mr. O'Donnell, we've spent years now on this property trying to make it productive.
00:36:38
Wanted to start use in the floodplain.
00:36:40
There's that SE.
00:36:42
In 1979, a small amount of fill was allowed to hold up the road to give it access to Hechinger Drive.
00:36:48
That is the only
00:36:49
use in the floodplain, nothing else is proposed, no changes, but we're carrying forward because without that little bit holding up the road, we wouldn't have access to the parcel, but you see an SE for fill in the floodplain.
00:37:02
We are not proposing anything within floodplain to level set.
00:37:06
So you may recall that we were before you with this property in 2023 for a special exception amendment to help unlock this long vacant property.
00:37:15
We'll discuss that 2023 approval in a second, but
00:37:19
What we did is we came up with a rule book of environmental protections that would allow the site to then go back and actually be usable because it was limited to just office in these buildings at the time.
00:37:34
So I remember there was some hesitation from the Planning Commission because you didn't know what you were approving.
00:37:39
It was kind of a list of uses, some lines, and it was a six-page plan set.
00:37:45
and now we're back before you kind of with what was asked which is a specific development plan, 40 pages of detail now so you know exactly what it is that is proposed.
00:37:55
To quickly go over the, let's see, the history of the property, it is very isolated.
00:38:02
It's located between the Springfield Mixing Bowl and the VRE Railroad line so it is a very tough site.
00:38:09
It sits below the highway.
00:38:11
and so visibility is minimal.
00:38:14
So this is really only suitable for a destination commercial use.
00:38:22
In 2023 we learned that this is actually the most, it was at the time, I don't know if anyone's beat it yet, but one of the sites that received the most pre-application meetings trying to figure out how to make this work.
00:38:37
The
00:38:38
Original SE again was approved in 1980 and it limited only to office.
00:38:43
And this owner has tried.
00:38:46
They did spec suites.
00:38:47
They did marketing campaigns.
00:38:50
They even put the site up for auction and no bidders.
00:38:53
So it was now, then we came in and there's just no market for it.
00:38:57
We came in in 2023.
00:38:59
and came up with a laundry list of environmental approvals and protections in the development conditions, all of which carry forward either as a special exception development condition or a proffer.
00:39:10
So we have that all vehicle repair must occur within a structure.
00:39:13
All buildings have to be green building certified.
00:39:17
Environmental protections, we negotiated last time where the dumpsters can be located and
00:39:22
There's treatment for the dumpsters at the site of the dumpster, and we RPA protection and revegetation, green building, salt management, commitment to LIDs, and that all stormwater must be treated on site.
00:39:38
To really set that up, we had to work with the Army Corps of Engineers to get a floodplain delineation, floodplain jurisdictional determination, and then an RPA delineation to know exactly where the lines are.
00:39:50
And as we discussed back then,
00:39:51
The Chesapeake Bay Preservation Ordinance allows for redevelopment of existing uses in RPA so long as there's no more impervious and it's no further encroachment.
00:40:03
And we are, as staff said, removing 61% of the previous impervious, the existing impervious in the RPA.
00:40:12
We can't remove 100%.
00:40:13
The only way to access the other parcel is that bridge that covers it.
00:40:18
So there are some areas that, and to get vehicle movement around the building.
00:40:22
So there's some areas that we can't, but we really did try to work to restore most of the RPA in this area.
00:40:30
Again, we had to then calculate, and this is all from the previous plan set,
00:40:34
exactly how much impervious where it is and then we created a building restriction line.
00:40:39
So we really created a rule book that then allowed us to come in with a specific use and that honors those rules and we even included a few more protections.
00:40:50
So our use is really limited.
00:40:52
Of the uses that were approved, and I've just gone straight to site plan under the previous 2023 SE, was heavy vehicle sale, new vehicle storage, heavy vehicle repair, production and processing, and a bunch of other uses.
00:41:12
So a quirk of ours is a carryover from the 1978.
00:41:16
In the I-5, we can have rental,
00:41:19
of the United States.
00:41:36
You could still only have rental and not sale.
00:41:39
We have to rezone to a district that allows the sale of passenger vehicles, and that's the only reason for the rezoning.
00:41:45
Otherwise, we proceed under our special exception.
00:41:49
As staff said, the existing site has over 225,000 square feet.
00:41:54
Additional GFA could be built under this zoning designation.
00:41:58
We're limiting it to zero point
00:42:01
0.08 FAR.
00:42:03
So we think that this is the least intense use that is viable to make this site productive.
00:42:10
It's fewer vehicle trips than any of the other uses.
00:42:13
It's restoring a majority of the RPA.
00:42:15
We have 3x of the required open space.
00:42:18
Staff already kind of went over the layout, so I will save that.
00:42:22
I think staff, and these are excerpts from the staff report, and I think they put it well, that the use is consistent with the use mix envisioned for this specific land unit.
00:42:30
It is in the Beltway South industrial area, but land unit B is not actually designated for industrial use.
00:42:37
And so it was consistent to have it be a commercial use, and we had originally submitted as part of the 2025 SSPA
00:42:44
just an abundance of caution because of that and worked with staff that we did not need to be part of that program because this use as proposed is in conformance with the existing comprehensive plan and staff acknowledges here that you'll see because vehicle rental is allowed in repair, because specialized equipment heavy vehicle sale is allowed by right on the site,
00:43:07
with the environmental protections carrying forward with a few additional ones.
00:43:10
Staff has asked for proffers on soil remediation and further preservation and walkthroughs with the urban forester that were in the original conditions.
00:43:23
So we're happy to have staff's approval.
00:43:26
We last night presented to the Mason District Land Use Committee and they recommended approval unanimously and hope for your favorable recommendation and happy to answer any questions.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
00:43:37
Thank you, Commissioner Snyder.
00:43:38
Commissioner Wang?
Alis Wang
Member, Planning Commission
00:43:41
Thank you, Mr. Chairman.
00:43:43
So one quick question.
00:43:44
Can you walk us through the proposed signs and why so many are being requested for this site?
00:43:50
I understand part of
00:43:51
The request is to allow for flexibility and that everything here meets standards for sign modification.
00:43:57
So I'm good with it, but just so everyone understands the reasoning.
David I. Schneider
Applicant or Nominator Representative
00:44:01
So one of the reasons, the main reason is development condition seven, which is I'm understanding it's not the standard condition in now that we don't have the CSP and everything is under the SE.
00:44:12
is any buy-write signage that would otherwise be allowed as set forth in subsection of the sign ordinance that is not shown on the SE plat is not permitted and will require an SEA.
00:44:24
So the majority of those freestanding signs, some of them are six square feet.
00:44:28
If you're over four square feet, you need a sign permit.
00:44:30
So if we need wayfinding to get through this tough site, to get across the bridge, we built in the flexibility that we don't know how many of those
00:44:39
This, you know, service this way signs that we might need on a poll.
00:44:43
And so we agreed to minimize the visual clutter of that.
00:44:47
But what I don't want to do is if we find out that people keep missing the turn to go to service, that we would have to come back before the commission and go through this whole process to get one freestanding sign basically on a site that's down below.
00:45:01
The building mounted in the temporary signage that theoretically could be seen is limited.
00:45:08
A lot of the addition is the amount of these freestanding signs.
00:45:12
And the goal is just to not need SCAs every time we find we need one more sign.
00:45:17
It's not that we intend to install all these, but when we heard that that was going to be the condition, we figured it was prudent to build that in.
Alis Wang
Member, Planning Commission
00:45:25
So essentially, the site is so isolated, so we need that option.
David I. Schneider
Applicant or Nominator Representative
00:45:29
Yeah.
00:45:29
And it's internal wayfinding.
00:45:30
We've limited the, you know, it's not that we're going to have a bunch of, we're at the end of a cul-de-sac,
00:45:37
F. Hechinger Drive.
00:45:39
So it's not even that if we had 10 monument signs there, it would make us any more visible.
00:45:44
So it really is, once you're on the site, how to navigate it.
Alis Wang
Member, Planning Commission
00:45:48
Great.
00:45:48
Thank you.
00:45:48
That's all I have.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
00:45:50
Commissioners?
00:45:53
Commissioner Landgraf, then Cortina.
Chris Landgraf
Member, Planning Commission
00:45:57
Yeah, I think you're going to need more signs out to just get people back to here.
00:46:02
About a thousand years ago, I worked in this area when I was in high school, and I'm telling you, it was hard for me even after I worked there for a while to figure out how to get back into this area.
00:46:14
So I agree not to have you come back for additional SEs.
00:46:19
I'd like the reduction of impervious in the RPA.
00:46:22
I'm glad to see that.
00:46:24
My one concern was the discharge location.
00:46:26
According to your plan, the discharge location for the 22B area seems to be immediately adjacent to what you show as a wetland location.
00:46:39
I just was wondering with staff, how is that, was that analyzed?
00:46:43
Was that, is that actually going to be a stable discharge?
00:46:46
Cause it doesn't look like it's actually discharging directly into the channel.
00:46:49
It looks like it's discharging at a weird angle to the channel, but it also looks like it's discharging in a spot that you show a wetland.
00:46:58
And so I'm just concerned about if we're doing any damage to that wetland.
Sharon Williams
Planner
00:47:01
That question did come up during our review and both stormwater and DPWES stormwater planning found it to be adequate.
00:47:09
There were no concerns with that discharge in that area.
Chris Landgraf
Member, Planning Commission
00:47:12
Okay.
00:47:13
All right.
00:47:13
Thank you.
00:47:14
No further questions.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
00:47:15
Commissioner Cortina.
Mary D. Cortina
Member, Planning Commission
00:47:17
Yeah, this is a much better place than where you were.
00:47:20
I seem to recall
00:47:22
pitching a fit about this last one.
00:47:27
Yes, especially the no plan plan.
00:47:30
Yes, it was too flexible.
00:47:31
This is definitely more of a plan than areas to avoid.
00:47:38
But I think the benefit of having gone through that process and having not really submitted a plan is that we were able to
00:47:48
Markoff areas not to encroach into.
00:47:53
But I think that if this is staff's doing, I really want to commend you for adding on to what was already some type of remediation of the site and then adding to it.
00:48:09
And I do like that it will be this kind of a use.
00:48:12
I think this is a good
00:48:14
Alternative, and I'm glad to see that there's something that can go there.
00:48:21
Being next to the VRE Iowa set that this would be an interesting place to put housing, but it's so close to the beltway and to the ramps, and you can't put new housing in floodplain areas, and so it's really
David I. Schneider
Applicant or Nominator Representative
00:48:38
It's really limited.
00:48:39
We did look at it.
00:48:40
When you get the noise contours with the mixing bowl right there, the already limited developable area becomes nonexistent.
Mary D. Cortina
Member, Planning Commission
00:48:48
Yeah.
00:48:49
And you're getting it on a curve, too.
00:48:52
So you're getting it from multiple sides.
00:48:53
There's just no relief.
00:48:55
So I'm glad to see that you definitely took our words
00:49:02
in earnest and came back with a real plan with real business and a real, you know, everything.
00:49:10
It's not so speculative.
00:49:12
I was very uncomfortable with that previous application.
00:49:17
But well done on this one.
00:49:19
Thank you.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
00:49:21
Anyone else?
00:49:23
I want to concur with that.
00:49:25
Having
00:49:26
been through the cycle a few times.
00:49:29
This is a tough site, but I really commend the owner for the diligence in trying to make this work, being very sensitive to particularly environmental implications.
00:49:40
So I really appreciate this project.
00:49:44
With that, if there are no other questions, then I'm going to open the public hearing.
00:49:51
We do have zero listed speakers.
00:49:52
Is there anyone in the auditorium who wishes to speak to this application?
00:49:56
Anyone on the phone?
00:49:58
There are no callers.
00:49:59
Okay, then I'll just check in with staff, with the applicant.
00:50:04
Commissioners, anything final on this?
00:50:06
Okay, then I'm going to now close the public hearing and recognize Commissioner Wang for a motion.
MOTION
Alis Wang
Member, Planning Commission
00:50:11
Thank you, Mr. Chairman.
00:50:13
Quick comments.
00:50:14
So I like that this application, again, proposes 46% open space onsite where only 15% is required.
00:50:22
Also, as noted, the proposed intensity is well below the FAR recommendations and would generate fewer environmental impacts as compared to alternative commercial uses.
00:50:33
Additionally, as mentioned, the application proposes to decrease encroachments into the RPA.
00:50:39
So all good news, and thank you to Sharon Williams as well as David Schneider for their work on this one.
00:50:45
So with that, Mr. Chairman, I request that the applicant confirm for the record their agreement with the development conditions dated March 12th, 2026.
David I. Schneider
Applicant or Nominator Representative
00:50:54
Again, David Schneider on behalf of the applicant and confirm our agreement to the development conditions dated March 12th, 2026.
Alis Wang
Member, Planning Commission
00:50:59
I move that the Planning Commission recommend to the Board of Supervisors approval of RZ 2025-MA-00020,
00:51:10
subject to the execution of the proffers consistent with those dated March 10th, 2026.
00:51:16
And I further move that the Planning Commission recommend to the Board of Supervisors approval of SEA 80-A-072-002 subject to the approval of the proposed development conditions dated March 12th, 2026.
00:51:30
Second.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
00:51:33
Been moved by Commissioner Wang, seconded by Commissioner Sargeant.
00:51:36
and Niedzielski-Eichner.
00:51:38
Was there a third?
John A. Carter
Member, Planning Commission
00:51:40
It was.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
00:51:41
It was Spain.
00:51:43
So Spain commissioners Sargeant, Spain, Bachelor-Causey and Niedzielski-Eichner.
00:51:49
All right.
00:51:50
Any discussion?
00:51:52
Hearing no discussion, all those in favor signify by saying aye.
00:51:55
Aye.
00:51:55
Opposed, nay.
00:51:56
Any abstention?
00:51:57
That motion carries.
00:52:02
Our third and final public hearing is interesting.
00:52:05
It's a combined concurrent public hearing on a plan amendment and a rezoning.
00:52:13
What I'm going to do is convene one public hearing, but we're going to have two presentations.
00:52:20
So starting off, again, this is Mount Vernon District.
PA 2023-IV-MV3 (PA-2023-00044) (Concurrent with RZ 2025-MV-00022)-Penn Daw Fire Station, Emergency Shelter and Affordable Housing
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
00:52:23
It's the Pendawe Fire Station Emergency Shelter and Affordable Housing, PA 2023-Rome Maneuver 4-M V3, also as
00:52:40
PA-2023-00044.
00:52:42
And again, this will be concurrent with rezoning RZ-2025-MV-00022.
00:52:55
Commissioner Clark is our lead commissioner on this.
00:53:00
We'll hear from Mr. Stinson first for the plan amendment, and then we'll hear from Ms. Cole for the rezoning.
David Stinson
Planner
00:53:11
Good evening, Mr. Chairman and commissioners.
00:53:13
My name is David Stinson from the Department of Planning and Development, and I'm accompanied by Tabatha Cole, Kathy Lewis, and Salem Bush, also from the Department of Planning and Development.
00:53:23
Also with us this evening is staff from the Fairfax County Department of Public Works and Environmental Services, Fire and Rescue, the Office to Prevent and End Homelessness, and the Department of Transportation.
00:53:34
This is the staff presentation for the plan amendment and concurrent rezoning application
00:53:38
for the Pendall Fire Station and Emergency and Supportive Housing Facility.
00:53:47
So we will start with the background authorization for this plan amendment.
00:53:52
The facilities proposed by this plan amendment are part of the Adopted Capital Improvement Program.
00:53:58
The Pendall Fire Station replacement was approved as part of the 2015 CIP, and the Emergency Shelter and Supportive Housing Facility was part of the 2016 CIP.
00:54:10
This plan amendment was authorized by the Board of Supervisors on December 5, 2023.
00:54:15
The original authorization directed staff to evaluate the potential collocation of three public facility uses on the subject property.
00:54:23
These public facility uses included a replacement fire station, an emergency shelter, and affordable housing.
00:54:31
However, during the early stages of the study, the affordable housing component was removed due to funding constraints.
00:54:37
As a result, the plan amendment now focuses on two co-located public facilities, a fire station and an emergency shelter with supportive housing.
00:54:46
The new fire station will replace the existing Pindell Fire Station, which is located approximately 500 feet to the north.
00:54:53
and is shown in blue on the map.
00:54:55
That facility was built in 1967 and no longer meets current operational needs.
00:55:00
The replacement fire station will accommodate modern staffing and equipment and improve emergency response and service delivery along the Richmond Highway corridor.
00:55:09
The proposed emergency shelter and supportive housing facility will provide an upgraded facility with supportive housing for both individuals and families.
00:55:18
The existing Eleanor U. Kennedy shelter, which is located near Fort Belvoir, approximately seven miles to the south, is undersized, operates in a repurposed historic structure, and cannot be expanded due to environmental and historic preservation constraints.
00:55:34
The Eleanor Kennedy Youth Shelter may continue to operate after the Pendall facility is constructed.
00:55:40
However, its long-term use has not been determined.
00:55:43
It also should be noted that any future change to the Kennedy shelter site would be subject to a separate 2232 public facility review.
00:55:52
So together the proposed co-located Pendawe Fire Station and emergency and supportive housing facility will modernize critical public safety infrastructure and expand access to emergency shelter and supportive housing in a more transit accessible centrally located part of the Richmond Highway Corridor.
00:56:10
So the subject property is a 3.5 acre site located along the south side of Beacon Hill Road and is a former site of the Hybla Valley Nursery.
00:56:20
A portion of the subject property is located within the Beacon Grove in CBC.
00:56:24
Additionally, the subject property has been walking distance of a planned BRT station along Richmond Highway.
00:56:30
The site is surrounded by single family residential to the east, north, and south, and by retail uses to the west.
00:56:38
So this project has involved extensive community engagement throughout the process.
00:56:43
To date, there have been 19 advisory community meetings, which took place between 2020 and 2026, which focused on site selection and design refinement.
00:56:53
In addition, eight community-wide meetings were held starting in April of 2021 to share project updates and gather public feedback.
00:57:02
Next we'll move on to the adopted plan recommendations for the subject property, which are located in the Mount Vernon Planning District within the MV5 Groved and Community Planning sector.
00:57:12
Additionally, a small portion of the subject property, three parcels that total 0.7 acres, are within the Beacon Groved and CBC and located in Lanyard C.
00:57:22
The entirety of the landing at sea is planned for 130,000 square feet of non-residential use with buildings up to 50 feet in height.
00:57:30
These parcels are zoned to the C8 district.
00:57:32
The majority of the subject property is located outside the CBC and contains three parcels that total approximately 2.8 acres and are planned for two to three drilling units per acre.
00:57:43
These parcels are zoned to the R3 district.
00:57:48
So before moving forward, I wanted to briefly highlight a clarification that was provided to the Planning Commission through a memorandum dated on March 19, 2026.
00:57:58
The staff report and draft plan text were originally prepared with the assumption that the proposed Pendawe Emergency and Supportive Housing Facility would replace the existing Kennedy Shelter.
00:58:08
However, following additional coordination, staff understands that the Kennedy Shelter may continue to operate after the Pendawe facility becomes operational.
00:58:17
and that the future use of the Kennedy shelter site has not yet been determined.
00:58:21
So in response to this, the draft plan text has been revised to retain the Kennedy shelter in the public facilities section of the comprehensive plan and to remove references including that the Pendall facility would replace it.
00:58:35
I'm sorry, including reference indicating that the Pendall facility would replace it.
00:58:41
The most important thing is that this clarification does not affect the overall analysis or staff recommendation.
00:58:49
So this slide summarizes the proposed plan text.
00:58:53
The plan amendment recommends an option for a co-located fire station and emergency shelter and supportive housing facility.
00:59:01
up to an intensity of 0.6 FAR.
00:59:05
This recommendation would support a three-story, approximately 55,000-square-foot emergency and supportive housing facility with 50 shelter beds, 20 supportive housing units for individuals, and 10 supportive housing units for families.
00:59:18
Along with a two-story, approximately 24,000-square-foot fire station to replace the existing Pendawe Station.
00:59:25
The plan text also includes guidance on site design, including transitions and buffering to adjacent residential neighborhoods, as well as multimodal improvements along Beacon Hill Road.
00:59:38
Staff recommends adding an option to the comprehensive plan for the co-location of a fire station and emergency and supportive housing facility on the subject property
00:59:46
at an intensity of up to 0.6 FAR.
00:59:50
The proposed plan text modification is outlined in the memorandum to the Planning Commission dated March 19, 2026.
00:59:56
This concludes the staff presentation for the plan amendment.
01:00:00
I will now turn it over to Tabatha Cole for the resigning presentation.
01:00:03
Thank you.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
01:00:04
Before we do that, let me get the applicant on the record with regard to reaffirming the affidavit.
SPEAKER_22
01:00:14
Good evening, Mr. Chairman and member of the Planning Commission.
01:00:17
My name is Claudia Shalhoub, and as the applicant agent, I reaffirm the affidavit dated March 13, 2026.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
01:00:24
Thank you very much.
01:00:25
Are there any disclosures?
01:00:28
Seeing no disclosures, Ms. Cole?
RZ 2025-MV-00022 (Concurrent with PA 2023-IV-MV3)- Board of Supervisors of Fairfax County, Virginia
Tabatha Cole
Planner
01:00:32
Thank you, Mr. Chairman.
01:00:34
Good evening.
01:00:34
I'm Tabatha Cole with the Department of Planning and Development, and we'll be presenting the concurrent zoning application.
01:00:41
As David mentioned, the three and a half acre site consisting of six lots is located just east of Richmond Highway on the south side of Beacon Hill Road and was previously operated by a plant nursery but now remains vacant.
01:00:53
As shown on this slide, the site has split zoning of C8 and R3 and is located in the Richmond Quarter overlay.
01:01:01
The C8 portion of the site is also located within the Richmond Highway Commercial Revitalization District.
01:01:09
The applicant proposes to rezone the site to the R-8 district to permit the development of two public facility buildings with a 0.52 FAR.
01:01:20
Central to the site is an existing overhead utility line.
01:01:24
With this development, the applicant proposes to underground those utilities.
01:01:28
The east portion of the site would be developed with a two-story fire station with four vehicle bays.
01:01:35
The western portion of the site would be developed with a three-story emergency and supportive housing building.
01:01:41
The two components of the emergency and supportive housing building would be separated with individual building entrances.
01:01:49
The fire station and housing facility would be accessed independently of each other with no shared vehicular or internal connection.
01:01:57
Both facilities would have a full movement access point with surface parking behind the buildings.
01:02:03
The fire station would also have a second one-way access point for emergency vehicles leaving the bay.
01:02:09
The site's frontage would be constructed with a 5-foot-wide sidewalk, 6-foot-wide bike lane, and a bus shelter as shown on this slide.
01:02:18
Both buildings would also have designated bicycle parking near the front entrances.
01:02:25
The site would have a one and a quarter acre of open space designated as private and public.
01:02:31
The public open space would consist of landscaped areas along the site's peripheries, while the private open space would be behind the housing facility and programmed with recreational amenities for the residents.
01:02:43
Storm water would be stored and treated on site through the use of an underground tension and filtering facility.
01:02:49
Treated storm water would then be released into an existing storm sewer near Schooley Drive just south of the site.
01:02:59
This slide illustrates the proposed landscaping throughout the site along with the shade structures with photovoltaic panels throughout the parking area.
01:03:08
Also shown are the locations for the proposed fences and retaining walls.
01:03:12
The site would be designed with the retaining walls to achieve the maximum allowable 4% slope for the fire station as required by DPWES.
01:03:23
Along the eastern property line, the retaining wall would increase in height from north to south with a maximum height of 20 feet.
01:03:30
At that highest point, a tiered down segment wall with landscape plantings would be constructed to minimize the visual impact of that wall.
01:03:37
To meet the transitional screening requirements for the fire station, the retaining wall would also be topped with a six foot tall barrier wall.
01:03:44
The emergency and supportive housing facility would have a six foot tall wooden fence along the southern property line and a portion of the western property line.
01:03:54
The fence would then transition to a retaining wall topped with an aluminum fence which would extend down the remainder of the property line and also between the housing building and the associated parking.
01:04:08
Shown on this slide are some perspective views from the GDP that illustrate the proposed architectural design.
01:04:16
Building materials would include but not be limited to masonry brick veneer, metal fiber cement boards, and insulated windows.
01:04:25
Staff finds the request to be in conformance with the zoning ordinance and in harmony with the proposed draft language for the comprehensive plan, therefore recommends approval of the application subject to the approval of the concurrent plan amendment and the execution of the proffers dated March 23, 2026.
01:04:40
Thank you very much.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
01:04:42
Thank you, Ms. Cole.
01:04:43
Board hearing date is the 14th of April.
01:04:49
Yes.
01:04:49
Thank you.
01:04:51
Ms. Shalove, would you like to make a presentation?
01:05:00
I'm going to bring this down just a little bit.
SPEAKER_22
01:05:07
Good evening, Mr. Chairman and members of the Planning Commission.
01:05:10
My name is Claudia Shalhoub, and I am the project manager with the Department of Public Works and Environmental Services representing the Board of Supervisors on this application.
01:05:20
I'm joined here by my colleague from DPWES, the design team representative from the Fire and Rescue Department and the Office to Prevent and End Homelessness.
01:05:29
I would like to first extend my gratitude to Tabatha Cole, David Stinson, and the staff of the Department of Planning and Development for their guidance through this application.
01:05:45
As mentioned, the project is located on Pendaw Road and includes a new Pendaw Fire Station that will replace the existing fire station and the addition of shelter and supportive housing.
01:05:55
The existing Pendaw Fire Station, located less than a mile from the proposed new site, was built in 1967 and has now exceeded its intended service life, can no longer meet service demands, provide inadequate female living quarters, and it lacks critical capabilities.
01:06:13
To meet the operational need, the proposed fire station will feature five drive-through apparatus bay for quick response time.
01:06:21
The fire station is designed for 22 bunk, which include a battalion chief suite.
01:06:26
Funding for the Pendawe Fire Station was approved in 2015 public safety bond referendum.
01:06:32
As planning development on the Pendawe Fire Station, the Hypla Valley Nursery became available and was found to be advantageous location for the new fire station.
01:06:41
The location on Beacon Hill Road allow first responders direct access to emergencies in the community and eliminate the need to provide temporary facility during construction.
01:06:53
Due to the size of the property and ideal location along Route 1, an opportunity was realized for potential co-location of additional facilities.
01:07:04
Funding for the Eleanor Kennedy Shelter was approved in 2016 Human Service and Community Development Bond Referendum.
01:07:12
The existing shelter that operates from a 100-year-old converted pump house located on land leased from Fort Belvoir cannot be expanded due to its location.
01:07:22
Location at a 100-year floodplain and renovations are limited by the building historic status.
01:07:29
The proposed shelter and supportive housing facility will provide 15 emergency shelter beds, 20 individual supportive housing units, and 10 family supportive housing units.
01:07:39
The project has undergone extensive community engagement since 2020.
01:07:46
The project team has worked with the advisory committee and the broader community, and the current project design reflects input received on key topics such as stormwater management, civic identity, respecting the surrounding residential community, building placements, and separation of outdoor amenities and primary entrances.
01:08:06
To date, there have been 20 advisory committee meetings and seven community-wide meetings.
01:08:12
Key topic includes review of the site selection and design alternatives providing multiple opportunities for public feedback.
01:08:20
Three concepts were presented and the current design incorporates the community and advisory committee feedback.
01:08:27
We have also met with the property owners that are on the south of the project site to discuss impacts, provide detail on landscape buffers, stormwater management, and address questions.
01:08:38
From the outset, the project website was created to keep the community informed about the project milestone and schedule of upcoming community meeting.
01:08:48
We also installed an information board on the site with QR code that provide direct access to the project website.
01:08:55
Site benefits.
01:08:56
The property is roughly three and a half acres and provides sufficient area to accommodate both the fire station and the shelter and supportive housing along with their parking and amenities.
01:09:07
The site's proximity to Route 1 and public transportation offer employment opportunities for shelter and supportive housing
01:09:15
A temporary fire station is not required since the site is located one block from the existing fire station, allowing the new facility to be constructed without interrupting current operation and services.
01:09:28
Since the site does not have on-site stormwater detention or treatment facilities, the stormwater drains south towards the adjacent homes.
01:09:36
This project provides an opportunity to greatly improve the quality and quantity of the existing stormwater conditions and address the neighborhood concerns.
01:09:48
The location of the program on the site was developed with input from the advisory committee, community, using agencies, and consistent with the adopted comprehensive plan.
01:09:58
By placing the taller three-story emergency shelter and supportive housing to the west closer to Richmond Highway, the two-story fire station is on the east portion of the site, creating transition from higher density along Richmond Highway to the lower density residential neighborhood.
01:10:18
In coordination with the comments received from the advisory committee and community, the architectural design of the development respects the character of the surrounding residential neighborhood, yet clearly reflects a modern civic facility, creating an exciting architectural addition to the community.
01:10:35
To break up the massing of the building, the design uses series of repetitive red brick towers throughout the development to create vertical proportions that is residential in scale.
01:10:47
The cornices at the top of the brick tower have unifying details, visually linking them together.
01:10:53
Furthermore, the top of the parapet at the apparatus bay massing aligns with the top of the beige brick that defines the two-story shelter volume, further strengthening the connection between the two buildings.
01:11:07
These architectural elements unify the campus and create cohesive development.
01:11:12
To integrate the residential character of the surrounding community, the design of the residential supportive housing incorporates elements such as punch double-hung windows as well as red and beige brick finishes that are common in the area.
01:11:28
Standard brick sizes are proposed to maintain the residential scale.
01:11:32
The building material include a combination of fret and beige brick at the tower and the lower two stories, with metal panels at the third story of the supportive housing.
01:11:44
The building also incorporates storefront glazing and punched window to align with the surrounding neighborhood,
01:11:51
and blend in with future planning of the area along with providing strong civic presence.
01:11:57
Canopies over the parking area were added to support additional photovoltaic panels.
01:12:04
Separate amenities have been incorporated across the site to support each programmatic use which have been reviewed and coordinated with the using agencies.
01:12:13
On the left, we have partial plan of the shelter amenities.
01:12:17
Number two or six are welcoming plazas
01:12:20
to the shelter residents, those plazas are separated from the outdoor space by a fence.
01:12:27
Number seven is an outdoor space that had picnic tables, outdoor seating, and workout equipment.
01:12:32
On the right, we have plan of supportive housing amenities, children playground on the east section of the plaza, turf area in the center for playing and running, some seating area and covered nook for social gathering, serving area for picnic and gathering.
01:12:49
In concern for the immediate neighbors and the retaining wall adjacent to their properties, this slide shows the southeast highest point of the retaining wall with a buffer depicted at one year growth in the lower image and 10 years fully grown in the upper image, indicating the amount of screening provided to reduce the visual impact of the wall.
01:13:14
We are proposing the use of foam liner concrete finish as shown on the precedent image in the upper right corner.
01:13:21
In addition, the project team has incorporated a stepped retaining wall along portion of the east and southern side of the retaining wall with evergreen planting to provide maximum year round screening.
01:13:34
The lower right corner image shows the retaining wall and buffer area section.
01:13:39
The buffer area planting will comply with zoning ordinance requirements of a mixture of evergreen trees, deciduous trees, and shrubs.
01:13:48
The majority of the trees will be evergreen, which provides screening from day one.
01:13:53
The project employs several sustainable design strategies in alignment with Fairfax County operational energy strategy.
01:14:01
The project being designed for LEED Gold with energy performance improvement with several strategies include reducing outdoor water usage by utilizing native plants that do not require irrigation.
01:14:14
Whole building energy and water metering, enhanced commissioning.
01:14:18
In addition to LEED Gold, the project is to achieve net-zero energy, an efficient mechanical system along with enhanced envelope design and the addition of rooftop solar panels.
01:14:32
Both fire station and shelter and supportive housing are designed to be all electric buildings to reduce reliance on fossil fuel.
01:14:41
The project would include electric vehicle charging stations.
01:14:47
In summary, the Pendell Fire Station Emergency Shelter and Supportive Housing project is a critical investment in the future of the community.
01:14:55
The extensive community engagement helped shape the design of the project by co-locating the fire station with the shelter and supportive housing
01:15:06
We are supporting county goals by enhancing public safety and supporting the population experiencing homelessness and promoting sustainable development.
01:15:16
And this concludes my presentation and I'm happy to answer any questions you may have.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
01:15:21
Thank you, Ms. Shalu.
SPEAKER_22
01:15:23
Thank you.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
01:15:24
Questions from commissioners, starting with Commissioner Clark, our lead on this?
Walter C. Clarke
Member, Planning Commission
01:15:30
Yes, good evening.
01:15:31
Thank you, Mr. Chairman.
01:15:32
I will ask my fellow commissioners for their questions and comments before I make questions.
Candice Bennett
Parliamentarian, Planning Commission
01:15:40
So I'm just curious, because I don't have the information.
01:15:45
I, like staff, thought that the Kennedy shelter was going to be closed, and so I'm just curious, what is the update?
01:15:53
I thought that building was well past its life cycle.
SPEAKER_22
01:15:58
You're talking about the Eleanor Kennedy Shelter?
01:16:01
Yeah, it's past the life cycle.
01:16:03
Also, it's sitting on a flood plain, so expansion is hard, is impossible, is prohibited.
01:16:09
And also, it is on the historic district, so renovation will be very limited.
01:16:15
So we did do this study, but it was hard to expand and renovate.
SPEAKER_08
01:16:22
If I can add, commissioners,
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
01:16:31
Please, the question was, is it going to have continued use, and if it's going to have continued use, will it be upgraded in some fashion?
SPEAKER_08
01:16:40
Sure, I'm Rashali Oak with the Department of Public Works.
01:16:44
With regards to the continued use of the Eleanor Kennedy shelter, that is something that staff is going to evaluate.
01:16:51
As Claudia mentioned, it is a very old facility, and while the county has kept it going for so long,
01:16:59
The main shelter component of it is going to be moving to the new PennDOT co-location facility.
01:17:06
However, the use of that structure is something that is to be determined so that is something that staff will be evaluating and that will include discussions with leadership as well as, you know, consideration of feedback from the community as well.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
01:17:26
Is that it?
01:17:30
I have Commissioner Landgraf and Carter.
Chris Landgraf
Member, Planning Commission
01:17:35
Thank you, Mr.
01:17:38
Chair.
01:17:39
So I'll echo Commissioner Bennett's concern because the Kennedy shelter
01:17:44
is a facility leased from Fort Belvoir.
01:17:48
And I believe it's, if not the oldest, one of the oldest buildings on Fort Belvoir's property list.
01:17:55
It was originally a water treatment plant for Fort Belvoir.
01:17:59
So it's really not the greatest use for shelter.
01:18:04
And in 2016, when we first had the conversations about getting something and replacing it, it seemed like a great time to do that.
01:18:12
The building had just hit 100 years, I think, at that time.
01:18:16
So yeah, I'm hopeful that you guys can figure out how not to use the Kennedy Shelter in the future.
01:18:25
But anyway, going to the retaining walls.
01:18:31
I mean those are some serious walls so that's a concern and I'm glad that you're stepping them up to make it you know to reduce the massing in some respects but I do have some concerns about the pictures you showed we're we're planning to put in photovoltaic
01:18:47
And then it looks like in 10 years those canopies may actually be shaded by the trees that we're going to put in.
01:18:53
So if this is a net zero building, have those canopies actually been factored into that fact?
01:19:00
Because your picture on sheet A301 kind of indicates that some of those photovoltaic canopies will be shaded after the 10 year point.
01:19:11
So is the bulk of your
01:19:13
electrical generation going to be on the rooftop?
01:19:16
Or are those canopies actually supposed to play a role?
01:19:20
And if they are, then I think you need to look at a different planting scenario.
SPEAKER_22
01:19:25
Yeah.
01:19:26
And we're happy to provide more information.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
01:19:28
Can you speak to the microphone, please?
SPEAKER_22
01:19:31
Yeah.
01:19:31
I'm happy to provide more information.
01:19:33
I have here, the design team have, Mark, would you be able to introduce yourself, please?
SPEAKER_16
01:19:41
My name is Mark Nettie.
01:19:46
So related to the PV canopies, I think they're going to be elevated quite substantially with iron and low landscape planting in that area.
01:19:54
So if you can go back to that image.
01:20:00
Probably the retaining wall, well actually that image that you just had up might be able to, you can see the retaining wall height, then we've got the two tiered condition and plantings occurring at both.
01:20:11
Those planters are sized so they can allow for a tree to be planted at those higher levels, but the canopies are actually above them, approximately 14 feet above the grade.
01:20:24
So I think there's gonna be enough elevation change that
01:20:29
The orientation of the sunlight coming from the south side won't be challenged by those plantings.
Chris Landgraf
Member, Planning Commission
01:20:38
Well, if you could go, staff, if you could go to the 10-year picture.
01:20:43
That was the one that kind of highlighted even more than just the A301 sheet.
01:20:50
Your photo that showed the 10-year growth.
01:20:55
And then while you're getting to that point, the other question I had is, so if this is going to be a net zero facility, which I think is great, I didn't see an actual room for battery energy storage or battery storage because I was concerned if you're going to have, if the, if the system is actually going to have electrical vehicle charging and you're not actually charging a battery to charge those vehicles, then you're going to have a significant draw whenever you plug those vehicles in.
01:21:22
And how is that going to work in your overall balance of the power for the buildings?
01:21:26
But there you go.
01:21:27
That 10 year growth buffer, you see that?
01:21:31
You see how the, where the canopies are in your one year growth.
01:21:36
And then you look at that 10 year growth and you can't see the canopies anymore.
01:21:40
And so if those canopies are part of your equation, then your, your own picture shows that you're potentially shading your own canopies.
01:21:49
And that's just a concern because if you're trying to get to net zero, then you're going to need every single canopy available.
SPEAKER_16
01:21:54
I think the perspective is likely a little bit misleading because you're down about 24 feet, maybe even further from where the image is being shot.
01:22:04
So I don't think you're going to have the blockage that you're thinking in this, but we can surely do a site section through there.
01:22:10
Actually, you can see the section there.
01:22:13
And then the canopies actually would be 14 feet above the finished floor.
01:22:17
I don't think you're going to have a challenge related to that, but we can surely make sure that the tree species that we select in those areas are maintained and will not grow to a substantial height that would block those canopies.
01:22:33
That retaining wall isn't consistent along the entirety of the site.
01:22:37
It's only consistent behind the fire station.
01:22:39
As you move further down to the parking that serves the emergency and supportive shelter, that parking is on grade.
01:22:47
There is a buffer that's next to that, so I agree with you.
01:22:52
We should take a look and make sure that the tree plantings don't conflict.
01:22:56
Related to the power condition, we did discuss whether we wanted battery storage on this site.
01:23:02
We don't think that's appropriate for this site.
01:23:04
The building is fully connected to electrical service.
01:23:07
The net-zero discussion relates to the amount of power that you're generating offsetting the amount of power that you're demanding.
01:23:14
But we still have power to the building, and the power to the building would be what's charging the vehicle charging stations.
Chris Landgraf
Member, Planning Commission
01:23:24
Sadly then that means that the entire complex isn't really net zero because you're actually still drawing off the grid.
SPEAKER_16
01:23:29
That's consistent with most projects that are considered net zero.
01:23:32
You are still plugged into the grid, but you're generating enough power to offset the demand.
Chris Landgraf
Member, Planning Commission
01:23:39
Okay.
01:23:39
Uh, final question on your sheet where you show the connection to the, and this is again to staff here, you show the connection to the stormwater.
01:23:46
You just kind of make note that it's going to connect into the existing stormwater system.
01:23:52
which I'm assuming was built probably when the neighborhood was built in the 40s or 50s.
01:23:58
The concern is I didn't see a, I didn't actually see a manhole at that location so I'm just concerned about how you're gonna transition this new storm water system into the existing storm water system without creating a problem for the existing storm water system since this is, I think the, sadly the overall watershed that this is in is an impaired watershed so
01:24:23
If we're going to be doing this with this great-looking stormwater system that you have, I just want to make sure we're not overtaxing the existing system once you connect.
SPEAKER_16
01:24:35
So John Leftop, the civil engineer, is here, and he can speak to that.
01:24:38
But we are providing quite a bit of improvements to the site, but I'll let John speak specifically to that question.
01:24:46
You want to sit right here.
SPEAKER_19
01:24:49
The commissioners, John Leftov with IMEG, civil engineer for the applicant.
01:24:54
And you're right, we don't have the exact location because that's on private property.
01:24:57
We haven't surveyed it yet.
01:24:58
We're in the process of doing that.
01:25:00
We know generally where it is and it's about where it's shown on there.
01:25:03
But what you have is a manhole.
01:25:05
That is fed by an existing stormwater pond over by the Brain Scarf building, which is to the west.
01:25:10
And then that manhole travels to a yard, which is in these folks yard, and then it goes into the street.
01:25:16
So we're analyzing that entire system downstream.
01:25:21
from that point.
01:25:22
And of course the onsite detention is going to be very robust so that we can draw down that peak release to help mitigate how much water is going to that.
01:25:33
And that's part of the outfall analysis.
Chris Landgraf
Member, Planning Commission
01:25:35
Well, and I'm glad to see that, but my concern is we're doing a PA and a rezoning so we don't really get another bite at this apple today.
SPEAKER_19
01:25:42
Well, where it's shown is very close to where it exists in reality.
01:25:48
We've gone and walked it.
01:25:49
We just haven't surveyed that yet.
Chris Landgraf
Member, Planning Commission
01:25:52
And you also are still analyzing the stormwater system.
01:25:56
Previously, we've had problems where we connect new stuff to old stuff, and the new stuff requires a minimum 15-inch pipe, and the old stuff is 12-inch pipes.
01:26:05
And that's my concern is, have we analyzed that enough to know that the capacity of the existing pipes is going to not be exceeded by the discharge?
SPEAKER_19
01:26:14
There's a possibility we would have to upsize some pipes.
01:26:17
OK.
01:26:17
They're all in current easements.
01:26:21
Right.
Chris Landgraf
Member, Planning Commission
01:26:22
But unfortunately, none of that is shown, so that's my concern.
01:26:26
But I'll yield, Mr.
01:26:28
Chair.
John A. Carter
Member, Planning Commission
01:26:30
Commissioner Carter?
01:26:31
Yes, could you pin up the open space drawing?
Tabatha Cole
Planner
01:26:49
We have two presentations.
01:26:50
This was staff's presentation showing the open space.
01:26:53
Did you want the applicants?
John A. Carter
Member, Planning Commission
01:26:56
I think this will do.
01:26:57
My issue is the waiving of the urban park standards for this.
01:27:05
I think there's a difference between the plan amendments and the zoning case.
01:27:12
The plan amendment recommends waiving the urban park standards because the park standards are
01:27:19
Lowe.
01:27:21
I don't think we want to do that.
01:27:23
And it looks to me like this site, you see the green hatched, looks like there's plenty of public open space there.
01:27:31
So we don't need to waive the urban park standards.
01:27:35
Maybe this is a distinction that's not important to some, but I just don't think it's appropriate for a public project to be waiving urban park standards, even if they are small.
01:27:49
The whole project
01:28:11
Waving urban park standards in this case, just to make it simply.
01:28:16
And especially since it looks like from this drawing, there's plenty of public spaces in the front would probably be the most appropriate along the sidewalk or along the back of the site.
01:28:30
My second question is, this is a plan amendment, but which plan?
01:28:35
Is there an area plan for the area outside the embark plan that we would be amending or is it just that small portion that's in the embark plan?
David Stinson
Planner
01:28:51
Only a small portion of the site is in the embark plan and as a result, that landing, for example, is planned for 130,000 square feet as a commercial space and we did not remove any of the
01:29:06
of the commercial space from that land unit.
01:29:09
So we didn't want to impede.
John A. Carter
Member, Planning Commission
01:29:11
So which plan are we... Is there even an area plan for the area outside the embark plan?
David Stinson
Planner
01:29:17
Is there an area plan?
01:29:20
Yes, yes, there is.
01:29:21
There is.
John A. Carter
Member, Planning Commission
01:29:22
So which plan are we waiving?
01:29:25
Which plan are we amending?
01:29:28
I've gotten stuck on this waiver issue.
David Stinson
Planner
01:29:32
So in terms of the park standards?
John A. Carter
Member, Planning Commission
01:29:35
No.
01:29:36
This is a plan amendment.
01:29:38
Right.
01:29:38
Which plan?
David Stinson
Planner
01:29:39
Well, we're amending both plans.
01:29:41
Both plans.
01:29:42
A portion of it is Embark and the portion outside of it as well.
John A. Carter
Member, Planning Commission
01:29:47
Are there any drawings or things like that that have to be amended as part of this or is it just the text?
David Stinson
Planner
01:29:52
Just the plan text.
John A. Carter
Member, Planning Commission
01:29:54
Okay.
01:29:55
All right, well, my main point is that urban park standards, I don't think we should be waiving that.
01:30:01
And I think the two staff reports are a little inconsistent.
01:30:05
So the second staff report is touting the amount of open space, which I mean, it's not big, but I think it's appropriate.
01:30:16
And that's a better way to do that.
01:30:18
And I don't think a public project
01:30:21
should be waiving urban park standards unless there's just really a solid reason for it.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
01:30:29
Could I ask Ms. Cole to respond to that on behalf of Commissioner Carter in terms of the waiving the urban park standard?
Tabatha Cole
Planner
01:30:39
Well, the waiving the urban park standard was part of the comprehensive plan amendment.
01:30:43
That was the park authority's assessment that it was such a small amount that would be required that they were
01:30:48
Mr. Stinson.
John A. Carter
Member, Planning Commission
01:31:03
I just don't, again, I don't think that's appropriate.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
01:31:07
I'd like Mr. Stinson to respond to that particular issue.
David Stinson
Planner
01:31:12
The urban, the park authority calculated that the urban, that the park, the requirement was 435 square feet of park space under the urban park framework for this proposed use.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
01:31:27
Was it necessary to waive the park standard?
David Stinson
Planner
01:31:31
Well, they felt that because this facility also did provide open space for the occupants.
01:31:41
For example, there's a children's playground and other amenities that would be adequate.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
01:31:52
Anything else, Commissioner?
01:31:53
We want to come back to this.
01:31:54
This is just an open question.
01:31:57
Commissioner Sargeant?
Timothy J. Sargeant
Member, Planning Commission
01:31:59
Thank you, Mr. Chairman.
01:32:00
I'm going to ask a real broad question.
01:32:03
Are these issues addressable, do you think?
01:32:08
I mean, I take them seriously because I have some other things here that bear witness, too, and that's how much more you are doing on these sites in terms of services offered, in terms of people treated, in terms of upgrades of critical emergency facilities like the fire station.
01:32:26
Do you need time to address these other issues?
01:32:31
Because this is a valuable, valuable project for this area.
Tabatha Cole
Planner
01:32:39
In terms of the stormwater, that could be something that could easily be addressed with a proffer stating that they would provide a study at time of site plan and if additional improvements are needed, if the applicant would agree to that.
01:32:53
For urban park space, I can't speak on behalf of the plan amendment, but there is adequate open space area that could potentially be labeled as urban park space up to the applicant's approval of that.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
01:33:10
Anything else, Commissioner?
Timothy J. Sargeant
Member, Planning Commission
01:33:13
Just getting back to that, if we can work together and get these issues, because you have so many critical things that are needed here.
01:33:19
50 emergency shelter beds, 20 individual housing units, 10 units for families, case management.
01:33:26
Meals, laundry, other support services, all critical, all well-served and well-located within this area.
01:33:34
So I appreciate everything that my fellow commissioners, because they're just trying to make it much better and consistent with what we do.
01:33:40
At the same time, this is important and critical, and we shouldn't lose sight of that in this process to get these other things done to get those services moving too.
Cathy Lewis
Branch Chief, Zoning Evaluation Division
01:33:51
Commissioner Sargent, Kathy Lewis with Planning and Development.
01:33:55
I was just going to note that the open space that is available, that is publicly accessible, is along the Beacon Hill Road frontage.
01:34:06
And obviously it's limited to in front of the shelter in support of housing because you can't sit in front of the fire station, otherwise you'd get run over by a fire truck.
01:34:16
But that is, I mean it was intended to be welcoming.
01:34:20
I think at one point the community did talk about the need for having a park and then
01:34:25
It kind of waned, but I would say that that is considered publicly accessible.
01:34:32
That is public open space at the front of that building between there.
01:34:35
And particularly given that there's going to be a bus shelter there.
01:34:39
So I am going to assume that people will be there.
Timothy J. Sargeant
Member, Planning Commission
01:34:44
The mobility built into this plan is pretty obvious, which is extremely important and positive.
01:34:49
So much appreciated for that.
01:34:51
Thank you.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
01:34:53
Commissioner Landgraf?
Chris Landgraf
Member, Planning Commission
01:34:55
Yeah, just a point of clarification.
01:34:56
I support this project.
01:34:59
I think to Commissioner Sargeant's point, it is a very valuable project, and it obviously is replacing aged facilities, as I mentioned with the Eleanor Kennedy Center.
01:35:08
But I do have some concerns because we are doing a PA and a rezoning all at the same time.
01:35:16
Normally, we have a gap in between there to ask these questions at the PA and then come back at the rezoning.
01:35:22
We don't have that tonight.
01:35:23
I just wanted to bring that stormwater concern and the photovoltaic issue now, but I do support what we're doing because I think it's important to replace our aged facilities.
SPEAKER_22
01:35:37
Yes, and we will do certainly take those considerations in mind when we proceed more with the design, for sure.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
01:35:45
We do have a gap here between tonight's action and the board hearing, which is the 14th of April.
01:35:55
So if there was a week that you wanted to defer to allow for the.
01:36:02
So these concerns get addressed so that it's not
01:36:06
something that has to be addressed prior to the board hearing but it's addressed by the commission and the commission gets or the board gets a clean commission recommendation.
Walter C. Clarke
Member, Planning Commission
01:36:17
Yeah, I would ask staff, in terms of what we've heard the questioning tonight, needing more time to hash this out, or... Salem Bush from the Department of Planning and Development.
Salem Bush
Branch Chief, Public Facilities and Development Review Branch
01:36:31
I mean, there's two issues I'm hearing.
01:36:33
The stormwater issue, that is not something that would be brought up with the plan amendment anyway, so I don't understand the difference between having the plan amendment on a different night and having the rezoning
01:36:42
The specifics of that stormwater would be calculated as part of the rezoning application anyway.
01:36:48
So very specific for a plan amendment.
01:36:52
With regards to the park space, we have a whole paragraph in the staff report that talks about the reasoning of why the park authority made this call.
01:37:00
And we recognize that that call is made by the park authority, but we're talking about 435 square feet that's recommended because it's partially in the CBC.
01:37:11
It's a technicality to remove that.
01:37:13
There's clearly enough open space on this property that still would be calculated like technically if we were to say it's open space, but it's really just a technicality here.
01:37:23
I mean, there's still meaningful recreation space there.
01:37:26
I think that's the important thing that should be focused on, not a technicality of 435 square feet of open space for the plan amendment.
Walter C. Clarke
Member, Planning Commission
01:37:36
And, you know, I would say, is that something that we're willing to risk when we have this great need that will serve the community that has
01:37:46
community support.
01:37:48
And there's, since November 2020, that this task force, the advisory committee, was put together.
01:37:55
And the community has been totally engaged with this.
01:38:00
There's been on-site visits to it.
01:38:04
So the park space and the urban design, I mean, that's, again, we're a block off of Richmond Highway.
01:38:14
We have the Kennedy Center that we're saying needs to be replaced.
01:38:19
This is not replacing it.
01:38:20
The Kennedy Center will remain for now as we know it and will be assessed to see if it can continue.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
01:38:28
Commissioner, it's your decision as to how you want to move this.
01:38:33
If you want to move for approval, my recommendation is move for approval.
01:38:37
If you want to defer for a week to allow for these further considerations, you could do that.
01:38:42
It's your call.
Walter C. Clarke
Member, Planning Commission
01:38:43
Right.
01:38:44
Well, we'll continue with, I don't know if other commissioners have questions and we have speakers and I think staff has spoken in terms of delaying a week or not delaying a week will make a difference or not.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
01:38:57
So, we'll get to the public hearing.
01:39:02
Are there any questions, additional questions?
01:39:04
Commissioner Hancock?
Jeremy Hancock
Secretary, Planning Commission
01:39:05
Yeah, thanks.
01:39:06
I wanted to follow up on the urban park space and just to understand what the
01:39:10
I think that's a good question.
01:39:24
You know, this, what's publicly accessible versus what's park space.
01:39:28
And in some other cases we've had more than enough park space, but then this question was like, what's designated as publicly accessible?
01:39:35
Is the solution here just making the large designating larger portions of that open space as publicly accessible?
Cathy Lewis
Branch Chief, Zoning Evaluation Division
01:39:44
Kathy Lewis, Department of Planning and Development.
01:39:49
I suppose we could ask the applicant to do that, but I do know that the Director of Public Works is still steaming about that and regularly brings that up in context of the judicial complex where we had asked for
01:40:04
some sort of easement.
01:40:07
I'm not sure it's necessary.
01:40:12
I'll leave it to the Planning Commission as to whether or not it's necessary, but the director has made a lot of complaints about that.
Jeremy Hancock
Secretary, Planning Commission
01:40:25
Well, I think it's, what's the, what's the point of it's right.
01:40:29
And with that application, there was other factors that, that the position was around security and it's right.
01:40:39
And I don't think we have that with this, this instance, this, this application.
01:40:43
So, um, I guess if, unless there's another reason why certain areas aren't designated open space.
01:40:52
that to sort of solve this sort of urban park space issue, right?
01:40:57
It's not a lot of space, but it's hard for me to see why more area wouldn't just be designated as open space just from a precedent setting and what we expect from other applications.
01:41:08
But I'll turn it back.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
01:41:10
And unless there are other commissioners.
01:41:13
Commissioner Cortina.
Mary D. Cortina
Member, Planning Commission
01:41:14
Thank you, Chairman.
01:41:16
Yes, I think having a director philosophically opposed to
01:41:22
Publicly accessible urban space on public projects that is policy is inappropriate.
01:41:31
So I think this is something that needs to be followed up on because there may have been at the judicial center a security issue, but the publicly accessible park space that we ultimately
01:41:49
that staff ultimately negotiated, if you will, was closer to the building than the area that did not have that space.
01:41:57
And we are in the process of replanning the government center grounds.
01:42:03
And if that is also not subject to publicly accessible, I mean, it calls into question our comprehensive plan.
01:42:12
So on a point of principle, I support my fellow commissioners.
01:42:17
On the point of practicality, 452 square feet versus 50 supportive housing, 20 for families, or 10 for families, 20 for whatever the other, thank you.
01:42:36
It's not worth splicing.
01:42:38
The hair's over, but I think it is a follow-up question that we should pursue, and I don't think we should
01:42:45
We should hold up this application for that question.
01:42:49
But I think it's more than a technicality.
01:42:54
So furthermore, I just wanted to ask, because we are seeing these plan amendments come at the same time as the rezoning, there is not the opportunity to really
01:43:07
talk about the planning choices because we have a rezoning right behind it and we, you know, it's kind of too late to ask some of these, frankly.
01:43:19
But I did wonder on the embark plan, the yellow lines, I'm looking at the legend for the area, the CBC area that was part of the embark plan.
01:43:31
Now, part of that premise was that we don't really encroach into those neighborhoods with more development, that those sort of stay around where they are.
01:43:45
But in this case, we've got a fire station, which is something that is typically found in a neighborhood.
01:43:52
And then we have this supportive housing.
01:43:55
We have housing at an intensity that is much greater than what's in there.
01:44:01
Yes, it is front-loaded toward the commercial side, but when you were looking for properties, when you were going from this investigation from 2020 until 2021, you had many years to look for an area.
01:44:23
What was the discussion around sort of extending that line
01:44:30
further into the neighborhood, you know, from a planning perspective.
01:44:35
This is going to the plan amendment itself.
01:44:39
And this is a question for the planners, for David.
01:44:47
I mean, is it an issue of you found a piece of property and it was close enough to the things that we needed it to do, like be near transportation and et cetera, that we wanted to sort of
01:45:00
Move that line, the planning line that had been there before, or I'm just trying to understand where this supportive housing and shelter component fit into an edge neighborhood along a CBC.
01:45:20
I mean, let me just ask you that from a planning perspective.
Salem Bush
Branch Chief, Public Facilities and Development Review Branch
01:45:25
Well, that's not the call of the planning department.
01:45:28
We didn't select the location.
01:45:31
The location was selected over a period of time by DPWS and through the steering committee and advisory committee looking at alternate locations.
01:45:40
So I think the question would be better answered by DPWS on that one.
SPEAKER_22
01:45:43
OK.
01:45:44
So we did evaluate approximately 25 sites, and when the Hybla Valley site came along, the size of it, it kind of fits the criteria that we looked for when we were looking for sites.
01:45:57
And the site selection took about two, two and a half years of community, very intense community engagement.
01:46:03
and that was, the selection was made because of all the criteria that the site has.
01:46:08
It's close to the existing station, which doesn't require any temporary, close to Beacon Hill Road, so it allows easy access of the emergency vehicle to the emergencies.
01:46:18
It's also close to commercial neighborhoods, so it allows, and close to transportation, it allows for easy job searching, easy transportation, public transportation, and also the size of it, it just fits both uses together.
01:46:33
and that was also in coordination with the Supervisor Office, Advisory Committee and community.
Mary D. Cortina
Member, Planning Commission
01:46:41
But when you looked at trying to find properties, did you look within the bounds of the CBC?
01:46:47
I mean, the thing is that this is such an interesting co-location.
01:46:52
Having a fire station which really does, generally a fire station can be found along the neighborhoods and at the edges of the neighborhoods.
01:47:00
We don't normally have the supportive housing
01:47:03
in those neighborhoods as well.
01:47:06
Not to say that it couldn't be in this location.
01:47:08
I understand that.
01:47:12
I'm just trying to understand when we pass a plan
01:47:15
like the comprehensive plan for Embark, which says these are the commercial areas, these are the neighborhoods, this is what we sort of work out with the community.
01:47:27
And then when the county goes to look for properties, are you actually looking at the existing comprehensive plan rather than going to expand the boundary of the sort of commercial area?
01:47:43
Or maybe the question is, is the supportive housing commercial at all or is not considered?
Salem Bush
Branch Chief, Public Facilities and Development Review Branch
01:47:49
No, it's considered a public facility, which is what the plan amendment is focused on.
01:47:54
And it's also partially housing, too.
01:47:57
It's residential.
01:47:58
So it's not a commercial use, the shelter.
Mary D. Cortina
Member, Planning Commission
01:48:00
It's just housing at a higher density than what was planned.
Cathy Lewis
Branch Chief, Zoning Evaluation Division
01:48:05
Kathy Lewis, Department of Planning and Development.
01:48:07
I would note that at the beginning of this, and this may have been before the pandemic, may have been during the pandemic, it's a blur.
01:48:15
But when this site was found, it was thought, well, we're going to be using it for the fire station.
01:48:22
And there was a decision made that, well, if the county is buying such a large site,
01:48:28
We should make the most of it.
01:48:30
We have another use that we need to improve.
01:48:37
I mean, we're all talking about how the Kennedy shelter has a lot of issues.
01:48:42
We should look to make the most of the land that we are buying.
01:48:45
And in that way, we're using the county's dollars wisely.
01:48:50
So that was when the shelter was introduced.
01:48:55
And I would note that
01:48:57
Having the two co-located isn't all that unusual because we were visited by Montgomery County who came to talk about a shelter and a fire station that they have right next to one another in Wheaton, Maryland.
01:49:13
We learned about that.
01:49:15
So I think that that was when the decision was made that it wasn't just going to be a fire station.
01:49:22
It was a fairly large piece of property and that, you know, what else could the county use it for?
Mary D. Cortina
Member, Planning Commission
01:49:29
So the original hunt for the land was really based on fire station needs, not fire station slash support.
Cathy Lewis
Branch Chief, Zoning Evaluation Division
01:49:36
Correct.
01:49:37
But the property they found presented an opportunity to that.
Mary D. Cortina
Member, Planning Commission
01:49:41
And I do agree on the fire station.
01:49:44
Anecdotally, I have heard that there are quite a few calls to the fire department from people who, sadly, need shelter or need food.
01:49:59
And we'll call the emergency services who come and help them.
01:50:06
And that's a sad commentary, but to have those
01:50:11
Services nearby.
01:50:12
One of the things I wondered about with this supportive housing, is it all, in terms of transportation, is it all just walking and cars?
01:50:25
You don't have a shuttle or anything like that planned?
SPEAKER_22
01:50:28
No shuttles planned, but the bus stop and pad is planned for the project.
Mary D. Cortina
Member, Planning Commission
01:50:35
Okay.
01:50:36
Well, thank you.
01:50:36
I appreciate the explanation about the
01:50:40
Land and the add-on, and yeah, it helps to understand that.
01:50:46
Thank you.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
01:50:47
Thank you.
01:50:48
This is a public hearing.
01:50:49
We do have two listed speakers.
01:50:51
I'd like to go ahead and hear from our speakers.
01:50:55
Tanya Greenfield.
01:50:56
Tanya, are you here?
01:50:58
Please come down.
01:51:00
And then Mary Paden will be next, and she'll be on the phone.
01:51:10
Welcome, Ms. Greenfeld.
SPEAKER_23
01:51:12
Hi.
01:51:14
Thank you, Mr.
01:51:16
Chair and Commissioner Clark and the Planning Commission.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
01:51:20
Let me raise this up a little bit for you.
SPEAKER_23
01:51:22
Yes.
01:51:23
My name is Tanya Greenfeld, and I am a member of the Spring Bank community, which is directly adjacent to the
01:51:33
The Projected Project, My Community Borders, Beacon Hill Road, Richmond Highway, and Quander Road.
01:51:39
So you can see our house from these plans.
01:51:44
Been a resident of that neighborhood for 12 years.
01:51:48
Witnessed the community engagement or lack of I do want to note before I share my prepared thoughts that there's a huge difference between inviting public opinion and gathering public opinion and doing something proactive with public opinion and I did not hear in the latest presentation what
01:52:19
people have actually been saying.
01:52:21
So while I am representing myself, I do know that many of my neighbors in Spring Bank agree that we're more in support of humane, cost-effective efforts to eradicate homelessness.
01:52:37
And this emergency shelter portion of this plan does not do that in our opinion.
01:52:46
And I have no issues with the fire station and I have no issues with the family shelter.
01:52:51
However, it has been well documented that our community has issues with the emergency shelter.
01:52:58
Emergency to me implies temporary.
01:53:01
and temporary assumes a plan beyond the emergency.
01:53:04
And this permanent emergency shelter doesn't appear to me to be doing anything to eradicate the condition of homelessness.
01:53:14
It appears to be simply housing a problem for the night and then throwing it back out on the street in the morning.
01:53:21
That seems to be the only plan that has been presented to me and the community.
01:53:28
So I don't see anything long-term here.
01:53:30
I see putting band-aids on amputation wounds, and I am not a fan of that.
01:53:34
Housing advocates, the Virginia Housing Alliance, for instance, prioritized housing first.
01:53:41
That is getting people off of the street and into permanent stable housing where they can regroup and become viable citizens again.
01:53:49
and I say again because most of these people had jobs, families and homes and they want those lives back and this emergency shelter isn't going to solve that problem.
01:53:59
It is simply going to create more problems within a residential area and it would be closer to any residential area from what I hear in Fairfax County than any other shelters have been.
01:54:11
So I think that we're wasting taxpayer dollars on this antiquated emergency shelter
01:54:18
and I think that it fails to adopt Housing First initiatives that I think could have much better returns for the same cost.
01:54:27
Our community feels that it has been steamrolled by these initiatives, this band-aid approach and I think that maybe we should be looking towards programs to prevent eviction and provide rent relief during times of financial hardship or programs that can help get these resources they need
01:54:45
get these people the resources they need to get back into the workplace, which would stop them from needing these emergency shelters in the first place.
01:54:54
So the Mount Vernon Councils of Citizens Association adopted a resolution and that didn't come up.
01:55:03
And this resolution, I think it was in 2021, regarded
01:55:07
Regarded the proposed project while it was still in the proposed state.
01:55:12
And they recommended that the MVCCA supported a family shelter, but formally opposed an adult shelter.
01:55:19
They requested an alternative site that wouldn't be literally in the heart of residential communities and schools.
01:55:24
And the resolution also demanded a one Fairfax policy equity analysis to assess potential negative community impacts.
01:55:31
To my knowledge, that didn't happen.
01:55:33
And I'd like to know why.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
01:55:36
Thank you very much.
01:55:36
I will continue.
01:55:39
Appreciate it.
01:55:39
Next, Mary Paden is on the phone.
01:55:41
Ms. Paden, can you hear us?
01:55:44
Yes, can you hear me?
01:55:45
Yes, we can hear you.
SPEAKER_11
01:55:47
Okay, great.
01:55:49
Yeah, this is bringing up some other meetings.
01:55:55
Toni and I were on the opposite side for about three years.
01:56:03
I'm now the chair of the Fairfax NAACP and I'm speaking in favor of the PennDOT Fire Station emergency shelter as a sort of housing.
01:56:15
Over the past several years, I was also a resident of that neighborhood living about a half mile from the shelter.
01:56:24
Now I live a mile from the shelter, but I was very much engaged with these meetings.
01:56:30
This shelter is long overdue.
01:56:33
When it's approved by the board this spring, I hope, and it's scheduled to be completed in 2030.
01:56:41
And that'll be 14 years after it was funded in a 2016 bond referendum.
01:56:50
So that's 14 years that people have been experiencing homelessness.
01:56:54
It's been sheltered at what I really consider a subpar facility plagued with sewage smells.
01:57:00
frequently failing HVAC and other systems.
01:57:04
If we're to use the Kennedy shelter continuing for anything, it really needs some repair.
01:57:10
I have been there and it's not a good place to live.
01:57:15
The country, Jasper County has really needed this new shelter.
01:57:21
It needs the 20 supportive, permanent supportive housing.
01:57:25
It needs a lot more permanent supportive housing.
01:57:28
It needs the family shelters.
01:57:31
It needs a lot more of those.
01:57:33
And although some of our analysis is the same, Thomas and mine, I believe the county needs to do much more to keep people from falling into homelessness, both in terms of rent relief and providing legal aid attorneys with eviction court and getting out of shelter through permit supportive housing and other means.
01:57:56
We still will have a need for a shelter.
01:58:01
The Kennedy Shelters has 50 beds and during the wintertime hypothermia we shelter another 50 homeless people on Route 1.
01:58:13
About 24 of them at Rising Hope and about another 24 of them kind of on the floor of the Kennedy Shelter.
01:58:22
There is a need for an emergency shelter, but we really need to do a better job of making that a short-term place for people to stay.
01:58:32
They shouldn't be spending five or six months there.
01:58:35
They should be spending weeks, not months, in an emergency shelter, but that's a different matter.
01:58:42
I'm urging you to approve this shelter.
01:58:47
Yes, it's located near a residential area,
01:58:52
Not really going to cause the big problems that people are brought up that they're afraid of.
01:59:00
It rarely does when a shelter is put near a residential area.
01:59:04
There's a lot of fears, a lot of fears of things that probably won't be as bad as people fear they will be.
01:59:18
Director of the management company, Shelter House, that will manage the down-profit, that will manage this facility.
01:59:26
John Byer, he may be here tonight.
01:59:28
I think he's, we're going to be very responsive to the neighbors' issues.
01:59:34
Welcome them over to meet the new residents, have a line they can call.
01:59:38
This was something we discussed during the meetings, that they have an issue with one of the residents wandering around.
01:59:46
I think this is gonna work out.
01:59:49
They give it a chance.
01:59:51
And I wanted to just comment.
01:59:53
I had a prepared statement, but I wanted to just comment on the two issues that came up.
01:59:58
One is the park space.
02:00:00
I attended all of these 27 stakeholder communities, every single one.
02:00:06
And this came up, and the neighbors did not want parks.
02:00:09
They wanted, there is a park.
02:00:11
There's a huge neighborhood park just a few blocks away from this.
02:00:15
They're more interested in a fire station.
02:00:18
We're just giving that space for something that the community can use.
02:00:23
There was much more space on the front of the building originally, and it was attended at the park.
02:00:28
But I don't think people want that as a park in this neighborhood.
02:00:32
They are more interested in a separate park for the people.
02:00:38
But everyone agrees that the homeless people
02:00:41
needed their own outdoor space and the families needed their own outdoor space with kids.
02:00:46
And we don't need to make those spaces public.
02:00:48
Those should be private for the people who live there.
02:00:51
So how do we want to work that out with the Park Authority?
02:00:55
Technically, I'm very much against making those spaces public.
02:00:59
We don't need that there.
02:01:04
In regard to the
02:01:09
What was the other issue?
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
02:01:11
Stormwater?
SPEAKER_11
02:01:14
Well, that's a stormwater so much as to...
02:01:17
I can't read my own handwriting.
02:01:30
Well, I can't see it there, but it's...
02:01:34
This thing was very well discussed.
02:01:36
Everybody was worried.
02:01:37
We had huge meetings.
02:01:38
We had small meetings.
02:01:40
We had video meetings.
02:01:41
We had field trips.
02:01:42
We had all kinds of meetings.
02:01:45
And everything was thoroughly discussed.
02:01:49
I think this thing just needs to happen.
02:01:51
We need to get people into a safer, better facility until they can get out of homelessness.
02:01:58
We need to provide those extra spaces for individuals and families so that they can be housed, which is still going to take another four years.
02:02:07
We just need to get on with this, really.
02:02:10
It's just been 14 years since the money was there, for 14 years.
02:02:15
We just need to work this out quickly and make it happen.
02:02:20
OK, thank you.
02:02:21
You can tell I'm a little frustrated.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
02:02:23
Thank you, Ms. Baden.
SPEAKER_11
02:02:24
Appreciate it very much.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
02:02:26
The Planning Commission, this is the first time the Planning Commission is hearing this, so we're not part of the 14-year problem.
02:02:33
I don't know what the history is, but we're just seeing tonight.
02:02:37
That said, is there anyone else who wishes to speak to this application here in the auditorium?
02:02:47
Is there anyone on the phone?
SPEAKER_00
02:02:48
Yes, we have Kristin Rosenthal.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
02:02:51
Ms. Rosenthal, we can welcome you.
SPEAKER_25
02:02:55
Thank you so much.
02:02:56
I appreciate being able to participate by phone.
02:03:01
I followed this issue from the beginning, and I am really impressed with the design
02:03:08
and how well the structures seem to fit into the new construction, the very dense construction that's already happened along Route 1.
02:03:17
We're becoming an increasingly urban area and I know that's not comfortable for those of us who have valued having our own lots and our own houses, but it is the reality.
02:03:30
I also, Mary has made many of the points I would make, the additional point I would make.
02:03:36
is that this will have daytime shelter available for people.
02:03:42
And that that is critical in these times of increasing climate, what, extremes, weather extremes.
02:03:53
And in the next five years, the flooding and the heat are gonna keep getting worse, as we all know.
02:03:57
And I appreciate the zero energy intent of the building, but I hope that stormwater drainage
02:04:07
I have two covers, won't delay the construction of this and very important and needed building.
02:04:14
Any further?
02:04:17
Thank you.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
02:04:18
Thank you.
02:04:19
Is there anyone else?
02:04:21
All right then.
02:04:22
No further callers.
02:04:25
I will ask you, is there anything else from staff on this?
Tabatha Cole
Planner
02:04:31
No, we have nothing else.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
02:04:34
Either the plan or the zoning.
02:04:37
Okay, anyone?
02:04:38
Anything else, ma'am, from DPWS?
02:04:44
I'm sorry, ma'am.
02:04:45
If you want to speak before we come, you can come down to the microphone and speak but you can't ask questions from the seat.
02:04:57
Yes, that's why I was asking you if anyone wanted to speak to come down to the microphone, so please come down.
SPEAKER_07
02:05:06
I'm sorry I'm a little late to this game, but I was only- Come up to the microphone and introduce yourself, please.
02:05:13
Okay, my name's Michelle Bingaman.
02:05:16
My family owns the house that will be adjacent to the fire station.
02:05:23
I'm late to the game.
02:05:24
I've only had one notice regarding this, even though I'm finding out that it's been in the works for
02:05:31
several years, but I wanted to see if there was any need to address security.
02:05:40
Over the years, we've had a number of break-ins, homeless people breaking into the house, stealing things, living in the basement, things like that, broken windows, damage to the house, and so I'm not sure
02:06:00
While I like the idea, I'm not sure if the location is perfect, but my concern, the greater concern, is just security, and if this is short-term,
02:06:14
That might attribute to issues with the nearest homes that has been an ongoing situation for many years.
02:06:26
So I'm not sure if there's other homeowners here that could speak to that, or if they've had the same problems with missing things or damage to the house or invasion to the house like I have.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
02:06:40
Okay.
SPEAKER_07
02:06:41
So I just wanted to express that concern.
02:06:43
I'm not trying to, you know.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
02:06:45
Appreciate you being here.
02:06:47
Appreciate your sharing that concern.
SPEAKER_07
02:06:48
But I thought maybe security or something could be addressed in regards to that.
Walter C. Clarke
Member, Planning Commission
02:06:53
Commissioner Clark.
02:06:55
I just asked, so your home is adjacent to where the new fire station is going to go?
SPEAKER_07
02:07:00
The new fire station directly.
02:07:02
I'm right next door.
02:07:03
And I see the buffer in the wall and the trees, and I know that would be very helpful.
02:07:10
But the thought occurred to me listening to the discussion here.
02:07:17
No one's mentioned security.
02:07:19
And I thought maybe that could be addressed.
Walter C. Clarke
Member, Planning Commission
02:07:23
Thank you for that.
02:07:25
And if we can have staff to address that issue, Mr. Sherman.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
02:07:29
Sure.
02:07:32
So ma'am, that's fine.
02:07:35
Thank you so much for being here.
02:07:41
So if you want to address that, and then I might ask ACD to speak on the matter of security, if that's OK with the staff.
SPEAKER_22
02:07:52
Yeah, Claudia Shalhoub with the Department of Public Works Environmental Services.
02:07:56
As far as security, we will be providing cameras inside and outside.
02:08:00
Those will be monitored 24-7 with staff on site to monitor the area.
02:08:05
Also, we will have duress alarm.
02:08:07
We will have key cards.
02:08:09
I don't know if it will be helpful to speak a little bit to some of the shelter
02:08:26
What we currently help the shelter client with, like some of the shelter, what they provide to the shelter client, that might help with the fact that people who experience homelessness, when they come into the shelter, they just don't leave, they will get a lot of services that help them go find jobs and stuff.
02:08:44
So I don't know if that would be helpful to speak to that.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
02:08:47
I think if, I don't know, is ACD able to, I think giving some perspective about, if you don't mind, I'd like to hear, if you could give some perspective not only about the operation, but this matter of how you provide security.
Thomas Barnett
Deputy Director, Office to Prevent and End Homelessness
02:09:04
Sure, thank you.
02:09:05
My name's Tom Barnett.
02:09:06
I'm the Deputy Director in the Department of Housing responsible for the Office to Prevent and End Homelessness.
02:09:11
We would be operating the shelter in support of housing there on the site.
02:09:15
through our contracted operators.
02:09:20
First about security, much of what Claudia was saying is very true in terms of security cameras, but we also have staff there 24 hours a day, seven days a week patrolling inside and outside the facility.
02:09:32
We also have a very important partnership with public safety, which is why having a fire station next door is important.
02:09:39
Many of our guests are very vulnerable in terms of their medical,
02:09:43
Fragility, older ages, disabilities.
02:09:46
So having close access to emergency services is very helpful.
02:09:50
But it's very important that we're also partners with the police department and that we contribute positively to the safety for the neighborhood.
02:09:58
And we take that very seriously at all of our shelters.
02:10:01
Not that we don't call emergency services.
02:10:04
I think you'll notice that many of them are for fire and rescue.
02:10:08
But we want the shelter and the supportive housing, as well as the fire station, to be a positive addition to the neighborhood.
02:10:16
And so that involves continuing the community engagement.
02:10:20
We don't stop when the shelter opens.
02:10:22
We build relationships with the neighbors, businesses, as well as residents, so that if they have concerns, challenges, problems that they see and we're not aware of, that they can contact the shelter director or staff
02:10:36
in the county government so that we can resolve those things immediately.
02:10:40
Oftentimes we have advisory committees following the opening so that we can be part of that.
02:10:45
I did want to address the concern around the housing first approach and shelters being inappropriate.
02:10:51
Every sort of professional mature homeless services approaches itself like a housing crisis response system.
02:10:57
It's the emergency room and that means people may need a temporary place to stay, but yes, you must provide housing.
02:11:04
And that's where this addition of supportive housing is going to be so important.
02:11:08
Most people will stay only a few months at the shelter, but for people that have no other option, often because of chronic health or disabilities, and have nowhere else to go in the regular rental market, that's where supportive housing provides the option.
02:11:22
So this is really a transformation, continued transformation of our homeless system out of a hundred-year-old building that's inappropriate in so many ways for people that are already fragile and have problems accessing services to a much more accessible, flexible space that meets all their needs, including longer-term housing for those that have no other option.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
02:11:45
I think you may have addressed this, but let me ask you, this isn't as if this facility is a brand new startup where all the operational considerations are brand new.
02:11:59
Your experience with managing facilities like this is
02:12:05
Extensive, is it not?
Thomas Barnett
Deputy Director, Office to Prevent and End Homelessness
02:12:06
Yeah.
02:12:07
I mean, certainly the staff in the Office to Prevent and End Homelessness, as well as our contractor.
02:12:12
I mean, I've been doing this all for decades, myself close to 30 years, working in New York City, Richmond, as well as Northern Virginia.
02:12:20
And of course we engage communities all across the country in best practices.
02:12:23
So we mentioned the Silver Spring shelter and fire station that's next to each other.
02:12:28
We also did a virtual field trip of the fire station above affordable housing, just further up Route 1.
02:12:34
in the city of Alexandria.
02:12:36
And we tried to convince people that were concerned that there are ways for these things to coexist to the benefit of both sides and peacefully.
02:12:47
And we saw that.
02:12:48
And shelters are not new.
02:12:51
Even supportive housing is not new.
02:12:53
This is research tested and proven ways to end homelessness in communities.
02:12:57
And that's why the county is investing in it.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
02:13:00
Thank you, Mr. Burette.
02:13:02
Ms. Shellope, do you have more to add or anything else that you wanted to speak before we close the public hearing?
SPEAKER_22
02:13:09
Yeah, I just want to add the...
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
02:13:10
I'm going to bring this down to you.
SPEAKER_22
02:13:13
Thank you.
02:13:17
I would like to just thank the commissioners and the community members for their feedback and comments.
02:13:21
This project has gone through a robust community engagement process and the input received has been instrumental into shaping the design of this co-located facility.
02:13:30
The project team has worked hard to develop the design that not only comply with the vision of the comprehensive plan but also address critical needs with the community.
02:13:41
The enhanced service provided by the county fire station
02:13:45
for the Fire and Rescue Department and the Office to Prevent and End Homelessness.
02:13:50
Our entire team is excited to be part of this important project and we are looking forward to your support in the development process.
02:13:58
Thank you.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
02:13:59
Thank you very much.
02:14:00
Commissioners, any final comment, question?
02:14:04
Commissioner Bennett?
Candice Bennett
Parliamentarian, Planning Commission
02:14:07
I'm just going to say I'm fully in support of this project.
02:14:11
This has been
02:14:12
A long time coming, again, as someone who very much works in affordable housing on Richmond Highway.
02:14:18
The need for emergency and supportive housing is just incredible.
02:14:27
The Kennedy shelter has served its purpose and it needs to cease functioning as a shelter.
02:14:36
And it's also been an isolated location.
02:14:39
Another benefit of this new location is that
02:14:46
clients will have easier access to transportation to get to work to be more self-sufficient.
02:14:54
And I also cannot underscore enough what Mr. Barnett said about the need for permanent supportive housing.
02:15:01
Most of the projects that we look at today are affordable housing, but they don't come with the case management and the wraparound services that we really need to complete that continuum of care.
02:15:16
And so this is a critical piece in the housing that we've just talked about, how much housing we need, but it is across a continuum.
02:15:27
So I fully support this project, whether we go tonight or two weeks.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
02:15:33
Thank you.
02:15:35
Now, we will have an opportunity to make comments once a motion is on the table.
02:15:44
So unless this is a question for staff, I would just recommend that we get to the point where we have a motion to consider, unless it's up to you, Commissioner.
Timothy J. Sargeant
Member, Planning Commission
02:15:55
My issues were on communication the other way, with the surrounding residents and what kind of program or protocols you have in place to have immediate communication and updates with surrounding residents.
SPEAKER_22
02:16:16
Latia Shalhoub, Department of Public Works and Environmental Services.
02:16:19
We have a project website that gets updated in every food community meetings.
02:16:26
Also, after the community meetings, we put the agenda, we put the presentation, and sometimes we put the recording.
02:16:34
We respond to community emails all the time.
02:16:37
We give ourselves a short period of time to gather information.
02:16:40
We have the actual site.
02:16:46
We have the board there, which has a QR code that anyone can scan it and go straight to the website.
02:16:53
Plus, we've got the advisory committee meeting that we have been doing.
02:16:56
We've gone through almost 20 advisory committee meetings and seven large wider community meetings.
Walter C. Clarke
Member, Planning Commission
02:17:03
And if I could quickly interrupt on that, sir.
02:17:06
And we had also talked about having a community liaison person as well.
SPEAKER_22
02:17:12
Yeah, the advisory committee group are the liaison between the community and the county staff.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
02:17:21
Did I hear correctly, Mr. Burnett, that from an operational practice
02:17:28
There is an ongoing engagement strategy with the community?
Thomas Barnett
Deputy Director, Office to Prevent and End Homelessness
02:17:34
Yes, sir.
02:17:35
This is a regular practice for new shelters.
02:17:38
There's typically questions and concerns.
02:17:40
And so we remain engaged with them after it opens, as well as before, to have a forum, a place for that to be resolved.
02:17:48
That's separate from the community engagement that's happened already.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
02:17:52
And you're committing to doing that with this particular facility?
Thomas Barnett
Deputy Director, Office to Prevent and End Homelessness
02:17:56
Absolutely.
02:17:56
I mean, the nonprofits that operate our shelters, they depend on community support.
02:18:02
And so it is a way to not only address concerns, but also build support in the form of volunteers, in-kind donations, as well as cash donations to help supplement county contracts.
02:18:13
Shelter House and many other nonprofits that run the shelters are very successful and dependent on that kind of support.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
02:18:20
Thank you.
Mary D. Cortina
Member, Planning Commission
02:18:21
Commissioner Cortina.
02:18:38
When you started, we had a certain number that we were working toward, and then everything kind of blew up.
02:18:46
But how many of these types of places should we have in the county?
Thomas Barnett
Deputy Director, Office to Prevent and End Homelessness
02:18:53
Sure.
02:18:54
So I think it's important to have shelters that are modernized, right?
02:18:59
And so we've done that with the Bailey shelter.
02:19:03
We're on the way doing that at the Embry-Rucker shelter.
02:19:06
Obviously, this new shelter at Pendall, even the Patrick Henry Family Shelter is converting to a new supportive housing model.
02:19:14
They don't all need to be constructed in single sites.
02:19:18
These types of facilities are important, but it's a range of different options.
02:19:22
Some, many.
02:19:23
In fact, most of supportive housing is actually rented in private.
02:19:28
Privately owned properties across the county.
02:19:31
There are rental units where services visit on site.
02:19:35
We know within homelessness, we have close to 300 people that are chronically homeless on any given night.
02:19:42
These are people that have severe disabilities and need supportive housing.
02:19:47
And so that is a measure, the number of chronically homeless individuals that we set as a working target.
02:19:53
Obviously that evolves over time as new people become chronically homeless and people get housed.
02:20:00
But that is a benchmark that we use.
Mary D. Cortina
Member, Planning Commission
02:20:03
For the supportive wraparound service housing, something that would handle around 300 total in the county, which sounds actually kind of low.
Thomas Barnett
Deputy Director, Office to Prevent and End Homelessness
02:20:13
But I would say again, it's not the only housing option for people experiencing homelessness.
02:20:18
Most people experience homelessness for a brief period of time.
02:20:22
And with support from local community-based organizations, they're able to get back up on their feet.
Mary D. Cortina
Member, Planning Commission
02:20:27
get back to work, meet their needs, and they don't need ongoing support.
Thomas Barnett
Deputy Director, Office to Prevent and End Homelessness
02:20:38
I will say that our community is going through a strategic planning process around homelessness and the Board of Supervisors has charged them to come back with some recommendations on what investments would have the greatest positive result in improving our community response to homelessness.
Mary D. Cortina
Member, Planning Commission
02:20:53
That would be great to come back to the Planning Commission sometime maybe during committee, Housing Committee or some other committee and talk about that sometime.
02:21:01
I think it would be great to add it to our comprehensive plan.
02:21:05
Now, and just the community expectation that we need to support housing and be proactively doing it.
02:21:15
I think a little bit of the pushback that you're hearing tonight, it's not pushback on the project, it's just that it's been going on a while and we haven't seen it.
02:21:25
And tonight we're seeing not only the plan, but also the rezoning.
02:21:29
And it makes us a little crabby sometimes because we like to weigh in on the comprehensive plan and then go to the next step, which is the rezoning.
02:21:38
But it's helpful to get all this back information and help us to start thinking about too where these are needed and how many and what we're talking about for the CIP.
Thomas Barnett
Deputy Director, Office to Prevent and End Homelessness
02:21:53
Well, I know you all have a very important role in making these decisions and you can only consider them when they are presented in front of you.
02:22:01
I think what you're hearing from all sides here is
02:22:03
We need it.
02:22:04
Yeah, it's been 10 plus years, and I would say exceptional community engagement compared to other projects that have gone through the county's process.
02:22:13
Just the number of meetings, virtual, in-person, ongoing updates, and following trails investigating and showing our work.
02:22:24
And I think that's been helpful, although obviously not every community member will agree.
Mary D. Cortina
Member, Planning Commission
02:22:30
Yeah, thank you.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
02:22:33
I had a small question.
02:22:34
Not to you.
02:22:36
This is to our staff.
02:22:41
There is a question raised with regard to net zero.
02:22:44
And I'm hesitant to raise it, but I'm afraid that if we don't address it now, it'll keep coming up.
02:22:50
Net zero doesn't mean isolated from the grid.
02:22:53
Is that correct?
02:22:55
Net zero means that there is an equivalent going in versus an equivalent going out.
02:23:01
And so the grid is always open.
02:23:04
I have a fairly sizable array of solar panels.
02:23:10
I can't operate independently of the grid because the Virginia law doesn't allow me to do that.
02:23:18
But I do get credit for the power that goes into the grid as an offset to the power I've received from the grid.
02:23:26
Am I correct in that our public facilities would have the same
02:23:30
a requirement or constraint.
Tabatha Cole
Planner
02:23:35
I don't have an answer for that exactly from the zoning application.
02:23:39
Their commitment that they've made is that they would get gold certification.
02:23:43
So that net zero commitment is not actually tied to any proffers that they're committing.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
02:23:51
OK.
02:23:52
But I do think at some point we need to be clear about what net zero means, whether it's profit or not.
02:24:02
We're going to have more of this kind of conversation.
02:24:06
Sure, I'm clear in what I understand.
02:24:08
Is my understanding correct?
02:24:10
Is there somebody who can speak to that?
SPEAKER_16
02:24:12
Yes, sir.
02:24:20
enough onsite power to offset your use onsite.
02:24:25
It doesn't mean that you're disconnected from the grid.
02:24:28
I don't know of any public facilities that are disconnected from the grid.
02:24:32
Maybe there are, but that would be a real challenge.
02:24:36
So the idea is you're going to generate as much as you use on an annual basis.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
02:24:43
And there's a safety basis for this.
02:24:45
We can't have a worker working on a down line and having power going into that line that he or she is working on from the solar panels.
02:25:00
We've really gotten into the depths of this in a big way, which is a good thing.
MOTION
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
02:25:05
But I'm going to close the public hearing and turn to Commissioner Clark for a motion.
Walter C. Clarke
Member, Planning Commission
02:25:10
Thank you, Mr. Chairman.
02:25:12
And before I move on a motion, I do have some prepared remarks to read.
02:25:19
And we did receive from the NVCCA Mount Vernon Council
02:25:26
on July 28, 2021, where they stated that they are in support of the co-locating family emergency shelter, affordable and workforce housing, Beacon Hill Road, and opposes including the Eleanor Kennedy shelter.
02:25:47
So that was their resolution.
02:25:49
So overall they're in support.
02:25:51
The Kennedy Shelter, as we know it, will remain.
02:25:55
And so we have, and recognize that we have that need in the community.
02:26:01
But on December the 5th, and some of this we've heard already from the applicant and from staff, but December the 5th, 2023rd, the Board of Supervisors authorized the consideration of the planned amendment
02:26:13
Concurrently with the rezoning application to evaluate the co-location of public facility uses, subject property, including the replacement of the pendal, fire station, and emergency shelter with the supportive housing for individuals and families.
02:26:31
The new fire station is intended to replace the existing Pindall Fire Station, number 11, which is currently in the neighborhood, probably less than a half a mile from where this new fire station will be constructed.
02:26:47
The existing fire station was constructed back in 1967 and no longer meets the operational needs of the Fairfax County Fire Rescue Department.
02:26:59
The replacement facility will
02:27:02
We accommodate modern equipment and staffing requirements to improve emergency response and enhance the services delivered along the Richmond Highway corridor.
02:27:14
The proposed emergency shelter and the supportive housing facility
02:27:18
We'll provide updated accommodations and services for individuals and families experiencing homelessness and including up to, as we heard, 50 shelter beds, 20 supportive housing units for individuals and 10 supportive
02:27:33
Housing Units for Families.
02:27:36
Supported services are expected to include case management, training opportunities, meals, and laundry service, which we've all heard that tonight, so I'm repeating those things.
02:27:46
But the project has included extensive community engagement, including the multiple advisory committee meetings and the community-wide meetings that were held over several years, which have informed
02:28:02
The proposed land use and site design and operational consideration.
02:28:06
I myself
02:28:09
been involved with these different meetings on site with the community there.
02:28:16
And this has all been led by Supervisor Stork's office, his chief of staff, Christine Morin, who chaired the task force and still involved.
02:28:26
So making sure that things are being done properly.
02:28:30
So I commend staff and the applicant for putting this together and having
02:28:36
really a model that we can continue to build on as a county and continue to co-locate other uses within the county such as this.
02:28:47
So, Mr. Chairman, I move on a motion that the Planning Commission recommend to the Board of Supervisors the approval of staff recommendation for Planning Amendment 2023, Roman Number 4-NV3,
02:29:05
as found in the memorandum to the Planning Commission dated March 19, 2026.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
02:29:11
It's been moved by Commissioner Clark, seconded by Commissioners Bennett, Batchelor-Causey, and Wang.
02:29:20
Is there any discussion?
02:29:22
Commissioner Carter.
John A. Carter
Member, Planning Commission
02:29:27
Just to resolve, my attempt is to resolve this urban park standard.
02:29:30
So I'm going to recommend a slight amendment to that motion.
02:29:38
And the amendment would read, rather than asking the board of supervisors to waive the urban park standards, which is what we would be doing, why not include a little sentence that reads like this?
02:29:49
And I know we want these claims, so that's why I'm going to just read it off.
02:29:55
Add to the motion, including a minimum of 432 square feet of open space required to meet the urban park standards in the public park space.
02:30:10
And if you remember, the drawing had a very large urban park space.
02:30:15
To designate a portion of that to meet the urban park standards seems to me would be very simple.
02:30:22
So that's my proposed amendment, or proposed addition to the, and that would resolve this.
Walter C. Clarke
Member, Planning Commission
02:30:30
So, Mr. Chairman, I will turn to staff to ask- It hasn't, I'm sorry, it doesn't have a second yet?
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
02:30:36
Is there a second?
Jeremy Hancock
Secretary, Planning Commission
02:30:38
I'll second for discussion.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
02:30:39
It's been moved by Commissioner Carter to amend Commissioner Clark's motion, seconded by Commissioner Hancock.
02:30:48
Commissioner, I think you've explained it, so you want to ask a question.
Walter C. Clarke
Member, Planning Commission
02:30:53
I'd like to ask staff, how does that comport with what we're doing here tonight to get this project?
Salem Bush
Branch Chief, Public Facilities and Development Review Branch
02:30:58
Yeah, so we of course we can't add that to the report and we can work with the park authority to open up some of that space to the public.
02:31:09
The issue I think that staff has is based on the feedback we heard from the community on the space, especially in the frontage, I mean the only space really that would be available for the open
02:31:20
to the public would be right on the frontage.
02:31:22
What we heard from the community consistently was they did not want that open to the public.
02:31:27
There are concerns that there's going to be loitering out in front of the building.
02:31:31
And because of the nature of the use of being a shelter,
02:31:36
It already has park space available to the public that's staying there, the residents that are staying there, not open to the public necessarily, but still fits the needs of those on the site.
02:31:48
So that was the concern and the reason, part of the reason why we did not, we agreed with the park authority on their assessment there.
02:31:55
And I think that was part of the park authority's assessment as well.
02:31:58
So that's just the concern that we have is just the community might not want that.
02:32:04
Commissioner.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
02:32:06
Commissioner Wang.
Alis Wang
Member, Planning Commission
02:32:08
Thank you.
02:32:08
Yeah.
02:32:08
I mean, we all want more open space, but I think in this situation, we want to move this project forward.
02:32:16
And if there's limited value to the public, and the public doesn't even want the space, to just blindly follow the formula, I think, defeats.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
02:32:24
I will comment on this and I completely respect Commissioner Carter's initiative on this.
02:32:40
This is not, in my view, the project to make a stand on.
02:32:45
There is a whole lot of work needing to be done on the use of the Urban Park Standard
02:32:51
This could be a case example, but I'm reluctant to support something for this particular project that has implications beyond open space, beyond the implications of park-run space.
02:33:15
So I'm not going to support this.
02:33:17
Commissioner Bennett?
Candice Bennett
Parliamentarian, Planning Commission
02:33:19
I'm going to echo your comments and that I'm not going to support this.
02:33:23
I agree with the community's concerns about the loitering.
02:33:27
Again, we had our office on Richmond Highway and we did have issues with loitering and I can just appreciate the concerns there and I won't support this.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
02:33:45
Anybody else?
Walter C. Clarke
Member, Planning Commission
02:33:46
Yeah, I was just going to add the same.
02:33:50
I do not support.
02:33:51
I mean, you're talking about folks that will be living there that are the most vulnerable amongst us, and we don't need to invite any other outside public that shouldn't be there.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
02:34:02
Okay, so it's been moved, seconded.
02:34:05
We've had our discussion.
02:34:06
All those in favor, signify by saying aye.
02:34:09
Aye.
Candice Bennett
Parliamentarian, Planning Commission
02:34:11
We're voting first on the amendment.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
02:34:15
This is the amendment.
02:34:15
I apologize.
02:34:17
So we're voting on the amendment to amend the main motion.
02:34:20
So this is Commissioner Carter's amendment, which is to have the language authorize the use of, to meet the urban park standard.
02:34:37
So all those in favor of Commissioner Carter's motion signify by saying aye.
02:34:43
That's Commissioners Landgraf and Carter and Cortina.
02:34:49
Any of those opposed?
02:34:51
Nay.
02:34:52
Nay.
02:34:52
Nay.
02:34:52
That's Sargeant, Spain, Niedzielski-Eichner, Hancock, Bennett, Clark, Wang, Batchelor-Causey.
02:35:02
Abstention and Thomas abstains.
02:35:05
That motion is defeated.
02:35:07
Now back to Carter Clark's original motion.
02:35:13
Any further discussion of the main motion?
02:35:18
Hearing no discussion, all those in favor, signify by saying aye.
02:35:21
Aye.
02:35:21
Opposed, nay.
02:35:23
Any abstention?
02:35:25
That motion carries.
Walter C. Clarke
Member, Planning Commission
02:35:27
All right, so then we have a rezoning, on the rezoning, a motion for the rezoning.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
02:35:33
Okay, please go ahead.
Walter C. Clarke
Member, Planning Commission
02:35:34
Okay, thank you, Mr. Chairman.
02:35:35
So I move that the Planning Commission recommend to the Board of Supervisors approval of RZ-2025-MV-00022, subject to the proffers consistent with those dated March 23rd, 2026.
02:35:51
I also move that the Planning Commission recommend approval
02:35:55
of the waivers of the minimum district size.
Candice Bennett
Parliamentarian, Planning Commission
02:35:59
Second.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
02:36:01
Okay, so Commissioner Clark moved.
02:36:03
Commissioners Spain, Bennett, Batchelor-Causey, and Wang.
02:36:08
Second.
02:36:09
Any discussion?
02:36:11
Hearing no discussion, all those in favor signify by saying aye.
02:36:14
Aye.
02:36:14
Opposed nay.
02:36:15
Any abstention?
02:36:16
That motion carries.
Walter C. Clarke
Member, Planning Commission
02:36:17
Is there anything else, Commissioner?
02:36:19
Mr. Chairman, I'd like to thank everyone for all their hard work.
02:36:21
I thank my fellow commissioners for their questions and concerns, and Ms. Kathy Lewis for leading the way, and Tabatha Cole, and Mr. David Stinson, and Salem Bush, and Claudia Schohe.
02:36:35
We had many meetings and many talks throughout the community, and appreciate the project, and we look forward to it going forward, so thank you.
Phillip A. Niedzielski-Eichner
Chair, Planning Commission
02:36:47
All right, is there anything else for the good of the order?
02:36:50
Seeing nothing else, this meeting is adjourned at 10.07 p.m.