        Good morning, everyone.
      • 00:00:10
        Welcome to today's Transportation Committee meeting.
      • 00:00:14
        It's February 24, 2026.
      • 00:00:16
        We will start, as we always do, by asking if anybody has any changes to the meeting minutes from December 2, 2025.
      • 00:00:28
        Shocker, no one does.
      • 00:00:30
        With that, we are going to get right to it with the first item on the agenda, which is a discussion of recommendations relating to the SmartScale program.
      • 00:00:44
        And with that, the floor is yours, Director Gregg Steverson.
      • Gregg SteversonDirector of Transportation
      • 00:00:50
        All right, good morning.
      • 00:00:52
        I'm Gregg Steverson.
      • 00:00:53
        I'm the director of Fairfax County Department of Transportation.
      • 00:00:56
        Here with me today is Noelle Dominguez.
      • 00:00:59
        She's chief of the coordination and funding division within FCDOT.
      • 00:01:03
        Let's see if we can bring up the presentation here on the screen.
      • 00:01:14
        Ah, there we go.
      • 00:01:16
        All right.
      • 00:01:16
        So we're here today to talk a little bit more about the SmartScale process.
      • 00:01:20
        And this presentation is an extension of the presentation we did back in June of 2025.
      • 00:01:27
        For those of you who got your packets, the presentation for 2025 is in there for context purposes in case there needs to be some revisiting or background information to remind yourselves of.
      • 00:01:41
        So SmartScale is the commonwealth's process for allocating transportation revenues.
      • 00:01:45
        It's based on a number of different factors.
      • 00:01:47
        You can see them here.
      • 00:01:48
        We'll talk about them a little bit more in later slides.
      • 00:01:51
        But the reason we're bringing SmartScale back is that, quite frankly, in the last cycle
      • 00:01:57
        Northern Virginia got very minimal funding and Fairfax County got no funding.
      • 00:02:02
        So we did a, staff did a cursory review of the smart scale factors and some of the projects that were funded and denoted some concerns with how first and foremost cost was prioritized given of course the cost of things such as right of way and other factors in Northern Virginia.
      • 00:02:23
        We had some concerns with how SmartScale tackled project readiness.
      • 00:02:27
        We'll talk about that in a little bit.
      • 00:02:29
        And then we also had some cursory ideas and concepts that at the meeting you all at the board asked us to go back and further review to better position ourselves for this upcoming SmartScale process.
      • 00:02:40
        And as you can see here on the timeline, we're getting close to that right now.
      • 00:02:45
        The process to start prescreening is coming up very soon.
      • 00:02:49
        Applications due the beginning of August, so we're in that season right now.
      • 00:02:56
        So our strategy was we tasked one of our consultants to evaluate the SmartScale process.
      • 00:03:01
        RK&K basically took all of the previous rounds.
      • 00:03:04
        We've had six rounds, one through six, of SmartScale, looked at our requests, compared them to similarly awarded requests.
      • 00:03:12
        We looked at the projects statewide, what were similarities, why were those projects funded.
      • 00:03:17
        And we're looking for patterns, looking for things that can help us better strategize for this upcoming round seven submittals.
      • 00:03:24
        So I'm going to turn it over to Noelle to talk about what we found out during the analysis and to give us some recommendations.
      • Noelle DominguezChief, Coordination and Funding Division
      • 00:03:33
        Mr. Chairman, members of the committee, Noelle Dominguez with the Department of Transportation.
      • 00:03:37
        So continuing on, sorry, I got misplaced a second.
      • 00:03:43
        We looked, our consultant looked at what we'd submitted over the past several rounds and we have submitted a total of 40 applications over the rounds one through six of the process and eight projects have been successfully funded.
      • 00:04:00
        I do want to note that in the first couple of years the process was annual and then they went to a biannual process a couple years ago so that's why you'll see
      • 00:04:09
        On this chart, it goes 27-2018 and then jumps to 2020.
      • 00:04:12
        But you can see these are the projects that we were successful in receiving funding for.
      • 00:04:19
        In round one, there were the Route 7 widening projects as well as a Route 28 project.
      • 00:04:25
        In round two, we had Route 29 as well as the Pope's Head Road interchange, Richmond Highway BRT in round three, Braddock Road.
      • 00:04:33
        Phase one in round four.
      • 00:04:36
        Round five had our route seven widening from 123 to 495.
      • 00:04:41
        And then this past round, as was mentioned, we did not receive any funding.
      • 00:04:49
        So continuing on, we do want to kind of go back to what the process was in the past.
      • 00:04:57
        Funding across the Commonwealth for the smart scale rounds.
      • 00:05:02
        The funding availability did vary from a low of about $860 million to a high of $1.7, $1.8 billion.
      • 00:05:09
        The request increased in recent rounds, causing a decrease in total funded projects.
      • 00:05:15
        of the Commonwealth.
      • 00:05:28
        While in the DGP, those are only within the transportation district.
      • 00:05:33
        There's also some eligibility items.
      • 00:05:35
        Localities, depending on what type of project it is, are generally eligible for both DGP and HPP, whereas regional agencies, such as, in our case, NVTA, NVTC, or PDCs across the Commonwealth, they are only eligible for the HPP funding, and that does somewhat play a role in things.
      • 00:05:54
        Also, they score things differently across the Commonwealth.
      • 00:06:00
        We are in area A, you can see us in the red along with Hampton Roads, and per state law, we have to have congestion rated the highest.
      • 00:06:09
        It's at 45%.
      • 00:06:10
        The other criteria, safety, accessibility, economic development, and environmental quality are all lesser.
      • 00:06:17
        I do want to note that awards for Area A, while low, are approximately three to four times higher when applying for the district grant programs only.
      • 00:06:26
        And in round six, our minimum request for the county was $70 million.
      • 00:06:32
        However, the maximum awarded funding to any project was $57 million.
      • 00:06:36
        So cost really does play a part.
      • 00:06:42
        So our consultant did look at scores across the Commonwealth when what they found was, and I think we've shared with this in the past, overall the county's average scores when it looks at benefit are higher than all projects for the most part until round six.
      • 00:06:56
        Round six we did have a bit of a blip there.
      • 00:06:59
        The county scores are competitively in all areas.
      • 00:07:01
        Primarily we are not as competitive in safety and economic development.
      • 00:07:06
        We did look a bit at that.
      • 00:07:07
        Essentially as far as safety, most of our projects are not
      • 00:07:12
        While they all improve safety, they are not specifically built for safety, the ones that we've submitted, whereas others from other parts of the Commonwealth can be built specifically tailored to safety issues.
      • 00:07:23
        And then economic development, we haven't focused a lot on this.
      • 00:07:26
        It is a very small portion of our SmartScale score compared to other parts of the Commonwealth.
      • 00:07:35
        And some of the criteria are related more to freight.
      • 00:07:37
        Economic development was geared more towards some of the rural areas of the commonwealth.
      • 00:07:43
        So we have not done as well in those criteria.
      • 00:07:48
        I do want to note that in all rounds, our county's benefit scores were very competitive.
      • 00:07:52
        However, once you add in the cost factor, all of our scores have reduced.
      • 00:07:57
        Our smart skill score gets a lot lower.
      • 00:08:00
        And I think we've mentioned that to you all before in the past.
      • 00:08:04
        We looked at, or the consultant looked at project type.
      • 00:08:09
        SmartScale essentially funds in categories, or this is how they organize them, bike ped, bus transit, rail transit, highway, and TDM.
      • 00:08:20
        So these numbers, there's a lot of numbers here and I apologize, but approximately 70% of all projects were highway projects.
      • 00:08:27
        So when you look at the whole
      • 00:08:28
        neighborhood of every single thing funded, 70% were highway projects.
      • 00:08:33
        35% of total requests were funded.
      • 00:08:38
        So of all of the highway projects submitted, 35% of them were funded across the Commonwealth.
      • 00:08:43
        When we get to bike ped, 45% of those total requests were funded and they accounted for about 20% of all funded projects through Smart Scale.
      • 00:08:53
        Bus and rail transit and TDM, they don't have a lot of submissions, but when they are submitted, they are more likely to get funded.
      • 00:09:03
        And then lastly, what we found was approximately 57% success rate if a project came from a STARS or a pipeline study.
      • 00:09:12
        For some, I think most of the board knows STARS, and we had to look up the acronym, so Strategically Targeted Affordable Roadway Solutions is what STARS stands for.
      • 00:09:23
        Those are VDOT studies that they come into our community, come up with some proposed solutions, and then often look to us to try to find the funding for, but they do come up with various
      • 00:09:34
        And then the project pipeline, this is performance-based planning to identify cost-effective solutions.
      • 00:09:42
        So sometimes it'll look at previous projects, make some recommendations, and then those can be submitted.
      • 00:09:47
        I believe actually Braddock Road, our first time we submitted it, we were not successful.
      • 00:09:52
        It went through pipeline, they made some edits, we made some changes to our project, and later in the process, it was recommended.
      • 00:09:58
        So it does seem that there is a higher success rate if stars or pipeline projects are submitted.
      • 00:10:05
        Other considerations we do want to note again, and we've talked about this before, cost factors do play a huge part.
      • 00:10:14
        We have high land acquisition, we have utility relocations, contingencies, those all add up and they are extremely high in our area compared to other parts of the commonwealth.
      • 00:10:26
        Most of these are beyond our control.
      • 00:10:29
        There are project readiness and documentation requirements.
      • 00:10:32
        It seems like every round there are different types of documentation required.
      • 00:10:37
        For instance, and the reason we have seven corners here, in a couple of rounds we submitted it, it was scored, and then in the last round we submitted it.
      • 00:10:44
        It was thrown out because we didn't have one of the documents that they required finalized.
      • 00:10:49
        We had it, but it wasn't fully finalized.
      • 00:10:51
        So even though they scored it in previous years, they decided it wasn't ready in the third round, which was an interesting thing, but that's why that's noted here.
      • 00:10:59
        And then regional entities in other parts of Virginia, as I mentioned, they do submit several applications.
      • 00:11:06
        Our regional agencies in Northern Virginia have not submitted to the extent
      • 00:11:12
        of other regions throughout the Commonwealth.
      • 00:11:15
        And those are also based on population.
      • 00:11:19
        And I think generally speaking, smaller jurisdictions can submit four projects, whereas we're allowed to submit 10.
      • 00:11:29
        In that same general way of going about it, smaller PDCs can submit four, whereas their bigger PDCs and regional agencies can submit 10.
      • 00:11:41
        And some eight regions have a lot of project submissions out there, not so much us in our area.
      • 00:11:50
        So coming to our recommendations, the recommendations that we are bringing forth are to cap our funding requests at 30 million,
      • 00:11:58
        And focus on smaller projects.
      • 00:11:59
        This is completely different than what we've done in the past, but we want to see how this works out.
      • 00:12:05
        Two, see which of our submissions and priorities align with stars and pipeline projects.
      • 00:12:09
        We have, as mentioned, they seem to have a fairly high success rate.
      • 00:12:14
        And let's see what's in there, what they've submitted for us, see if that helps out.
      • 00:12:19
        Submit a larger number of different types of projects.
      • 00:12:22
        As I mentioned, we're allowed 10 applications.
      • 00:12:24
        We're actually allowed 12 pre-applications, and it has to be reduced down to 10 for final submissions.
      • 00:12:30
        In the first round or two, we used to submit a lot more.
      • 00:12:32
        We have reduced that closer to four or five and more recently, so we want to kind of
      • 00:12:38
        Go back to the MAX and see what works for us.
      • 00:12:43
        Coordinate with our regional partners on joint applications.
      • 00:12:46
        Ensure projects meet readiness requirements, but do advocate for flexibility because going back to those readiness requirements, if funding isn't available for five or six years out, then to have some of this documentation that may or may not be necessary for another couple of years is somewhat complex, and we brought that up with the Commonwealth before.
      • 00:13:06
        Continue to encourage
      • 00:13:08
        Project cost normalization.
      • 00:13:09
        This is something we've talked about in the past that the board has written letters on in the past.
      • 00:13:13
        So we'd recommend continuing to advocate on a way to address that situation.
      • 00:13:18
        And then coordinate with our regional partners on advocacy efforts to advance our projects in the region.
      • 00:13:23
        As Mr. Steverson mentioned, the region as a whole did not do well this session.
      • 00:13:28
        And I think all of us are looking at what can be done.
      • 00:13:31
        So if we could work towards some regional consensus on a way to advocate for changes of some sort, that might be helpful.
      • 00:13:40
        So lastly, just our questions for the board.
      • 00:13:43
        Do you all have any questions about the analysis, its outcomes, or any of the staff recommendations?
      • 00:13:51
        And then we do plan on coming back to you all later this year with project recommendations before we submit applications.
      • James N. Bierman Jr.Member, Board of Supervisors
      • 00:14:01
        Thank you, Noelle.
      • 00:14:03
        Let's open it up to questions, and we'll start with Chairman McKay.
      • Jeffrey C. McKayChair, Board of Supervisors
      • 00:14:06
        Yeah.
      • 00:14:06
        First, I want to thank staff for doing the analysis because there was a lot of hypotheses as to why the region didn't do well before.
      • 00:14:16
        And now we have some formal analysis that's been done, including some recommendations.
      • 00:14:22
        And from my standpoint, I think we have to be doing kind of all of the above.
      • 00:14:27
        I think the one piece that I do have questions about, besides the strategic things we can do now that are within our power,
      • 00:14:35
        I guess the million dollar plus question here is whether we go back and look at any legislative fixes or not and what those would be.
      • 00:14:47
        I guess what strikes me, and I know that the devil's in the details, but when I look at economic development being 5%, that's very low as you mentioned compared to the rest of the state, like a quarter below anywhere else in the rest of the state and the next lowest being 20%.
      • 00:15:04
        I don't know if raising the economic development percent would potentially help.
      • 00:15:10
        Our projects score better.
      • 00:15:12
        But to me, acting as if transportation improvements in Northern Virginia somehow are not economic development when we're driving the entire state's economy is offensive at best, technically bad at worst.
      • 00:15:27
        And so I don't know if that's something that we should be looking at.
      • 00:15:30
        And if we've modeled, if we raise the economic development number,
      • 00:15:34
        That has to come out of something else.
      • 00:15:36
        So if you reduce some other figure that's within category A, what figure would you reduce?
      • 00:15:42
        And obviously we need to know if that helps our outcome or not before proposing something like that that would require a legislative fix.
      • 00:15:49
        And so the things that are in here that we can do ourselves, we should be doing for the next round because we need to test these and see if we can do better and act as if there's not going to be a legislative change.
      • 00:16:01
        On the other hand, we have a good period of time now before the next legislative session to look at, you know, strategically if we did do a legislative change, what would that be?
      • 00:16:11
        And then last, you know, the county executive and I had an opportunity to talk to the transportation secretary recently and I know that he is very well aware.
      • 00:16:20
        of Virginia.
      • 00:16:38
        Because even people in other parts of the state are like, hmm, this doesn't look great.
      • 00:16:43
        What happened here?
      • 00:16:45
        And so there's a statewide reason to want to fix this.
      • 00:16:48
        And we should be strategically partnering, I think, with the Secretary on what is in his mind and what things are in his mind that are doable that we should be pushing behind so that we can be on the same page.
      • Noelle DominguezChief, Coordination and Funding Division
      • 00:17:00
        And Mr. Chairman, if I may, so our current, going to your question about where would the percentages come from if we got more for
      • 00:17:08
        Economic Development.
      • 00:17:09
        Yes, it is at 5%, but again, the question is we have safety at 15, we have accessibility at 25, congestion at 45, and environmental quality at 10.
      • 00:17:20
        And they've generally done things in 5% tranches.
      • 00:17:23
        So to move economic development up, one of these would have to go down, understanding congestion is required by law to be our highest.
      • 00:17:31
        So that kind of gives limited flexibility here.
      • 00:17:35
        Also,
      • 00:17:36
        Because the criteria within economic development, some of them are based on land use and what kind of site plans are involved.
      • 00:17:43
        Some of them are based on intermodal and by that I mean freight and rail.
      • 00:17:46
        We don't have as big a component of freight and rail because people probably don't want to sit in our traffic and they go through 81 instead.
      • 00:17:53
        So if even if the percentage were higher, I don't know if that would help us out because this criteria was geared more towards some of those rural areas.
      • Jeffrey C. McKayChair, Board of Supervisors
      • 00:18:01
        Right.
      • 00:18:01
        What I'm asking though is different, which is if we would have to change
      • 00:18:06
        Thank you.
      • Bryan J. HillCounty Executive
      • 00:18:29
        Mr. Chairman, if you don't mind, I think we had a good opportunity to speak with the Secretary of Transportation but also with the Secretary of Commerce
      • 00:18:38
        And as the Secretary of Commerce stated, she's looking to do a strategic plan for Commerce, which dovetails very nicely into the things that we were discussing with Mr. Donahue.
      • 00:18:51
        If you give me another couple months to get those two pieces together to them, I think we'll be in a better place when we go forward legislatively into
      • 00:19:02
        Now, the things you stated that we can do internally, obviously we need to do, but this is a bigger lift than just looking at economic development going from, what is it, 15 to 20 or 5 to 10, but cross-walking the Commerce Secretary and the Secretary of Transportation is going to be key.
      • Jeffrey C. McKayChair, Board of Supervisors
      • 00:19:21
        Yeah, no, I totally agree, and I bring it up because I think we have a moment here where we have folks who are thinking economic development goes beyond
      • 00:19:30
        Thank you.
      • James N. Bierman Jr.Member, Board of Supervisors
      • 00:19:58
        Thank you.
      • 00:19:58
        I've seen four hands go up.
      • 00:20:01
        Now five.
      • 00:20:01
        OK. Andres, Walter, Rodney, Dalia, and Pat.
      • 00:20:08
        Make it easy by just laying it all out there to begin with.
      • Andres F. JimenezMember, Board of Supervisors
      • 00:20:12
        Well, thank you, Mr. Chairman.
      • 00:20:13
        And Noelle, thank you so much for your presentation, and thank you to staff.
      • 00:20:17
        One quick question is, can the board expect additional cost in implementing any of these recommendations moving forward?
      • 00:20:24
        Do you see the cost of the projects moving up?
      • Gregg SteversonDirector of Transportation
      • 00:20:32
        If you're talking about whether or not a project that let's say we submitted this past round and didn't get funded the next time around, it absolutely can.
      • 00:20:43
        Whether it's inflation, whether it's just more detail, it can absolutely go up in cost.
      • Andres F. JimenezMember, Board of Supervisors
      • 00:20:47
        And so do you see that as a hurdle moving forward?
      • Gregg SteversonDirector of Transportation
      • 00:20:50
        It's definitely been a hurdle in the past and I think it definitely will be one in the future.
      • 00:20:54
        I think one of the things we talked about in terms of things that we can advocate for, we talked about the normalization of cost I think is a huge one because if we're doing so well in benefit score and then it goes completely the opposite way when cost is factored in, that obviously tells us something is up with the cost and so I think that's something we have to probably advocate for.
      • Andres F. JimenezMember, Board of Supervisors
      • 00:21:18
        Yeah, with some of these projects, specifically at the Mason, when you look at the projects with different phases, that to me is worrisome.
      • 00:21:26
        You may know how to get through phase one, but what happens two, three, and four?
      • 00:21:31
        And where does that funding end up?
      • 00:21:33
        So, thank you.
      • 00:21:36
        Walter?
      • Walter L. AlcornMember, Board of Supervisors
      • 00:21:37
        Thank you, Mr. Chairman.
      • 00:21:38
        So, my question is on the recommendations.
      • 00:21:43
        If we cap funding requests at $30 million and focus on smaller projects, that makes sense to me based on the analysis of basically how these awards have been coming.
      • 00:21:54
        I guess, what does that mean for the larger projects that we need, particularly in the, I don't know, five to 15-year time frame?
      • 00:22:05
        And I guess setting aside if we are able to get legislative changes like the chairman was talking about and I'm specifically thinking about one of the fastest growing areas in the DMV is the Reston-Herndon area and with the Fairfax County Parkway backing up pretty badly now and I know
      • 00:22:28
        That widening as well as the interchange at Sunrise Valley is a pretty big ticket item.
      • 00:22:34
        What does this mean for larger projects like that?
      • Gregg SteversonDirector of Transportation
      • 00:22:39
        Yeah, a couple different things.
      • 00:22:41
        One, theoretically, you could also fund a piece of the larger project through SmartScale if that's one strategy you want to take.
      • 00:22:49
        Obviously, there are also other funding sources.
      • 00:22:51
        I won't call any by name, but they know who they are that are out there that we can also go after.
      • 00:22:57
        As we talked about in, I don't remember which meeting it was, but we talked about our funding 101.
      • 00:23:02
        There's also the possibility of federal money, but you gotta be careful because then you federalize a project.
      • 00:23:07
        So there are other funding sources out there.
      • 00:23:09
        We just have to continue to do what we do, which is our balancing act of understanding the rules around the funding vis-a-vis what we're looking at funding.
      • Walter L. AlcornMember, Board of Supervisors
      • 00:23:18
        So basically what you're saying is it wouldn't necessarily delay those larger projects by focusing our smart scale applications on the smaller projects.
      • 00:23:28
        Correct.
      • 00:23:29
        Okay.
      • 00:23:30
        Well hopefully we can open up the pipeline through some of the legislative and other changes the Chairman was talking about as well.
      • 00:23:37
        Thank you.
      • 00:23:38
        Thank you.
      • 00:23:39
        Rodney, go ahead.
      • Rodney L. LuskMember, Board of Supervisors
      • 00:23:40
        Thank you, Mr. Sherman.
      • 00:23:41
        I'm going to agree and minor more comments as opposed to questions.
      • 00:23:46
        So I appreciate the approach of going after STARS-related projects, because there are significant needs in our community for these projects.
      • 00:23:54
        And I'll give an example.
      • 00:23:56
        We currently have a STARS project underway in my district, which is involving the intersection at Southland Dorn and Franconia.
      • 00:24:06
        And I've heard from a number of residents about what are we going to do to get these improvements done and when.
      • 00:24:18
        So clearly there's some questions already starting around that and certainly this is a mechanism for us to try to figure that out.
      • 00:24:26
        And then I want to kind of agree with the comments of the Chairman and Supervisor Alcorn.
      • 00:24:32
        When I worked in economic development, when we recruited some of the larger employers, infrastructure and projects were of vital concern.
      • 00:24:42
        So if you look at like the projects with
      • 00:24:45
        Capital One, MITRE, and even PenFed, we talked about making improvements to the extension of Greensboro Drive, and that was a part of the kind of the package that went before those entities in making their decisions.
      • 00:25:02
        So I think
      • 00:25:03
        This point about the economic development score is one that I think is important for us to look at and to try to figure out how we might be able to raise that.
      • 00:25:15
        And it's important to the companies that would be considering coming to this county, which, again, affects our tax base, but affects the Commonwealth's tax base as well.
      • 00:25:27
        So thank you, Mr. Chairman.
      • 00:25:29
        Thank you.
      • 00:25:30
        Dolly?
      • Dalia A. PalchikMember, Board of Supervisors
      • 00:25:31
        Thank you, Mr. Chairman, and thank you so much to Noelle and the team.
      • 00:25:35
        So I agree, number one, I think what the Chairman was saying, absolutely, number one, we have to try to be more competitive in this round, right?
      • 00:25:43
        Through all routes, pun intended.
      • 00:25:45
        On one side, we can try to focus on legislative, which we obviously don't control ourselves, but on the other round, try to be more nimble.
      • 00:25:54
        I would also go back to where I think some of my colleagues have mentioned
      • 00:25:57
        And I think, Gregg, you spoke to it, is we have so many different sources, right?
      • 00:26:02
        I know, for one, that even looking at the smaller pieces, Commuter Choice, we didn't get one of the awards, right?
      • 00:26:08
        So I do think it would be helpful as we try to become more nimble and look at the different types of awards that are out there for different things that we realize things probably aren't going back to the way they were.
      • 00:26:20
        So trying to understand, number one,
      • 00:26:24
        with the STARS study.
      • 00:26:25
        So we have a great one that was done along Route 50 between Providence and Mason District.
      • 00:26:31
        So does that mean we start to try to look for more funding there?
      • 00:26:34
        We know that there are a lot of safety issues and concerns along that corridor.
      • 00:26:39
        But then on the flip side, for Blake Lane, VDOT had to use a different process and not STARS study.
      • 00:26:47
        And so does that mean that's less likely to get funded?
      • 00:26:49
        I mean, I think those are the kind of questions, when it comes just to VDOT funding,
      • 00:26:53
        and different types that we're probably at the point where we have so many different projects, different sizes, different scopes that I don't know how you and your team are tracking or sharing with us where we're kind of looking at the different pieces and where they fit in.
      • 00:27:08
        And then the last one that wasn't mentioned would be, you know, I've had some questions about would we consider things around TIF and proffers and different, when we talk about economic development, I think we have to think more
      • 00:27:23
        Dr. N. G.
      • 00:27:48
        A little bit more holistically or inform us as to how to better address when we know a community absolutely has been waiting for a project, for safety, for other reasons, and we want to try to address that.
      • 00:27:59
        So helping us understand the whole scale.
      • Bryan J. HillCounty Executive
      • 00:28:03
        It might be in our best interest at some juncture to look at all the proffers and see if we can renegotiate to move us forward.
      • 00:28:10
        So let's look outside the box because that's what we have to do nowadays.
      • 00:28:14
        We can't keep doing it the same way and expecting a different result.
      • Dalia A. PalchikMember, Board of Supervisors
      • 00:28:18
        I couldn't have said it better myself.
      • 00:28:19
        Thank you, Mr. Executive.
      • James N. Bierman Jr.Member, Board of Supervisors
      • 00:28:23
        Well said.
      • 00:28:24
        Pat?
      • Patrick S. HerrityMember, Board of Supervisors
      • 00:28:26
        I love case studies.
      • 00:28:28
        So Braddock Road, what changes did we make before we submitted, it got denied, we made some changes?
      • 00:28:36
        I'm just curious.
      • Noelle DominguezChief, Coordination and Funding Division
      • 00:28:37
        Mr. Chairman, Supervisor Herrity, I think in the first round was when we were still considering the larger widening of the full road, and we went, and part of the pipeline, we went more towards interchange and access management improvements across the corridor, and that's where we ended up getting funding.
      • 00:28:56
        I'm not gonna remember the round without looking at my charts, but that's why I think we got funding in the subsequent round.
      • Patrick S. HerrityMember, Board of Supervisors
      • 00:29:01
        So it reduced the land acquisition costs, basically?
      • Noelle DominguezChief, Coordination and Funding Division
      • 00:29:04
        That might have been part of it, as well as just general construction costs.
      • Patrick S. HerrityMember, Board of Supervisors
      • 00:29:08
        As I remember, that was a big piece of it.
      • 00:29:10
        And that kind of drives to my question.
      • 00:29:12
        In part of this, I think we've got to be looking to drive down the costs that we can control in our projects.
      • 00:29:20
        Because I know far too often the first thing I see on my projects have got 10-foot bike lanes on both sides and maybe a cycle track and that sort of thing, plus the right-of-way in between all those.
      • 00:29:33
        But we've got to build what's reasonable.
      • 00:29:37
        And at least with the parkway and with Rolling Road, what we started with and what we ended up getting funded and funding were slightly smaller projects.
      • 00:29:47
        Sounds like the same thing with Braddock Road.
      • 00:29:50
        So I think that's something we can do as far as the other recommendations.
      • Bryan J. HillCounty Executive
      • 00:29:55
        May I add to Jack?
      • 00:29:56
        I'm just curious, those changes were predicated by VDOT?
      • Noelle DominguezChief, Coordination and Funding Division
      • 00:30:01
        Mr. Chairman, I think we worked with the community and with VDOT.
      • Patrick S. HerrityMember, Board of Supervisors
      • 00:30:08
        On the changes I'm talking about, I worked with the community and VDOT as well.
      • 00:30:17
        Those are partners in funding and partners in getting it done.
      • 00:30:23
        I didn't end up with all the changes I wanted, but I didn't want the roundabout.
      • 00:30:27
        I wanted a skinny interchange, which would have reduced it a lot more.
      • 00:30:31
        That's another, I went with what the committee in VDOT wanted.
      • 00:30:36
        And we were talking earlier about other funding sources.
      • 00:30:40
        We haven't done a road transportation bond in a long time.
      • 00:30:46
        We got any plans to look at that as another funding source to go back to what I had heard earlier.
      • Noelle DominguezChief, Coordination and Funding Division
      • 00:30:56
        Mr. Chairman, Supervisor Herrity, I don't remember the timing of that.
      • 00:30:59
        I would have to go back and talk with DMB.
      • 00:31:02
        I know it's part of their, you know, they're definitely involved in that process.
      • Patrick S. HerrityMember, Board of Supervisors
      • 00:31:06
        Something we might want to consider because I know other jurisdictions are doing transportation bonds as well to fund important projects.
      • Walter L. AlcornMember, Board of Supervisors
      • 00:31:19
        Rachna?
      • Rachna Sizemore HeizerMember, Board of Supervisors
      • 00:31:21
        Yeah, I appreciate this.
      • 00:31:22
        And again, considering it's my first meeting, it's very interesting to think about
      • 00:31:26
        And we've talked a little bit about some of the challenges around getting smart skill funding for Northern Virginia.
      • 00:31:30
        So just a couple of questions.
      • 00:31:32
        We're talking about regional cooperation.
      • 00:31:33
        Have we worked through NVTC or NVRC on specific ways to cooperate regionally around some of these funds?
      • 00:31:44
        Was that an opportunity?
      • Noelle DominguezChief, Coordination and Funding Division
      • 00:31:47
        Supervisor, yes.
      • 00:31:48
        So I think that's something we're going to be talking with them about.
      • 00:31:51
        NVTC, I'm not sure if they've submitted many applications in the past, but if there is a good transit project, I think we can work with them on that.
      • 00:31:59
        NVTA as well, they've submitted two or three throughout the years.
      • 00:32:03
        I know NVTA is also very interested in this.
      • 00:32:06
        They're very aware how our region did compared to other parts of the Commonwealth.
      • 00:32:10
        That is something I think they're talking about and we're talking about with them.
      • 00:32:14
        And that might be one of those projects near a border or where there are multiple.
      • 00:32:18
        I think the last project they submitted was with Alexandria and Arlington.
      • 00:32:23
        So they submitted a project that went through two jurisdictions.
      • 00:32:25
        We might see if there's any in that area where we neighbor or close to a neighboring jurisdiction for one of those types of things.
      • Rachna Sizemore HeizerMember, Board of Supervisors
      • 00:32:32
        And then the second question I had is around the Braddock Road.
      • 00:32:35
        improvements because phase two is not funded yet and I don't know if smart scale is still going to be a possibility for funding for any parts of phase two especially if we're looking at smaller projects so you know that maybe outside the scope of this conversation in terms of the funding for the phase two Braddock Road but out of curiosity is the plan to still apply for smart scale for that phase two or what's the thought on that?
      • Gregg SteversonDirector of Transportation
      • 00:32:56
        Yeah, and I think that's probably something to discuss further.
      • 00:33:01
        Obviously, I think it's something, depending on what comes out of that, that could be done for SmartScale.
      • 00:33:07
        It's just we're probably not at the stage yet where we would make that specific decision, but I definitely think it's something to consider and continue to talk about.
      • Rachna Sizemore HeizerMember, Board of Supervisors
      • 00:33:15
        But happy to follow up offline.
      • 00:33:17
        Thank you.
      • James N. Bierman Jr.Member, Board of Supervisors
      • 00:33:21
        Thank you.
      • 00:33:23
        So I made the mistake of using everybody's first names when I first noted everybody.
      • 00:33:28
        And then I had to use everybody's first names.
      • 00:33:30
        So I'll go with supervisor from now on.
      • 00:33:32
        But anyway, I just wanted to note that.
      • 00:33:37
        Because when Rachna put up her hand, I was like, well, the first five people, I used their first name.
      • 00:33:41
        So anyway, supervisor Sizemore Heizer.
      • 00:33:44
        I had one quick question, which was,
      • 00:33:48
        It makes sense to me that you would want to not put all your eggs in one basket, of course, in the number of applications that we file.
      • 00:33:57
        But the one question I had is, what is the time and cost and energy that gets put into each one of these filings?
      • 00:34:05
        And is there any consideration there with respect to expanding the number of applications that we do?
      • Noelle DominguezChief, Coordination and Funding Division
      • 00:34:13
        I'm sorry, Mr. Chairman Bierman.
      • 00:34:16
        You can just call me Jimmy, but that's okay.
      • 00:34:22
        Applications are a bit detailed.
      • 00:34:23
        They do take some staff time.
      • 00:34:25
        They're not to the extent of a federal discretionary grant application, but it's something I think we would figure out how to manage internally, if necessary, get some help from.
      • 00:34:36
        I think part of our contract is have our contractor helping a bit with some of the
      • James N. Bierman Jr.Member, Board of Supervisors
      • 00:34:42
        as well.
      • 00:35:02
        And it sounds like we have had some internal conversations with the Secretary of Transportation that have been productive and the Secretary of Commerce.
      • 00:35:12
        So we may not need to send a follow up letter yet, but it may be something worth considering if we want to put our position on some of these potential changes out there.
      • 00:35:23
        And County Executive Hill, did you have, I see the hand.
      • Bryan J. HillCounty Executive
      • 00:35:28
        You know, I'm not sure when another letter needs to go, but I think the letter that they currently have coupled with the conversation that we had last week needs to be addressed.
      • 00:35:38
        And I have reached out to the deputy secretary who sent, I think, a letter to somebody that got back to me, and I redirected her thought process.
      • 00:35:49
        I'm going to be speaking with the Secretary again in a week or two down in Richmond, off hours guys, to really go in and figure out what's best not only for Fairfax County but what's best for the Commonwealth of Virginia.
      • James N. Bierman Jr.Member, Board of Supervisors
      • 00:36:05
        That sounds good.
      • 00:36:06
        Yeah, that's what I was basically saying was I didn't necessarily think we needed a letter.
      • 00:36:11
        But we do have some stuff out there that we want to continue moving forward.
      • 00:36:16
        And with that, why don't we thank you very much.
      • 00:36:19
        And why don't we close the smart scale discussion and move into an update on Capital Bike Share.
      • 00:36:27
        Thank you.
      • 00:36:28
        We'll give you a second to switch over the seats.
      • 00:36:55
        Okay, we've got an update on our Capital Bike Share program.
      • 00:37:00
        I have to say I was really excited when you put them out at the Innovation Station Metro.
      • SPEAKER_03
      • 00:37:05
        So let's jump into it.
      • 00:37:10
        Good morning, board members.
      • 00:37:11
        My name is Zack DesJardins.
      • 00:37:12
        I'm the Capital Bike Share program manager at the Fairfax County Department of Transportation.
      • 00:37:19
        So if you don't know, so just a little bit about Capital Bike Share.
      • 00:37:22
        It's a publicly owned and operated bicycle transit service.
      • 00:37:26
        You can unlock a bike and ride to more than 800 stations across eight jurisdictions, including 94 stations here in Fairfax County.
      • 00:37:34
        Our operations are managed by a company called Lyft, which you may have heard of.
      • 00:37:38
        They also manage RideHail.
      • 00:37:40
        They provide the bikes and maintain them.
      • 00:37:45
        The map on the right shows the existing stations in red.
      • 00:37:48
        The purple icons are plan stations in Fairfax County, and the orange stations show plan stations in our neighboring jurisdictions.
      • 00:37:56
        I'm sure you'll find the colors of the map quite familiar since those are your districts.
      • 00:38:04
        In terms of timeline, Capital Bike Share began in Arlington in 2010, as well as Washington, D.C.
      • 00:38:10
        It came to Fairfax County in 2016, kind of a little bit on the heels of the Silver Line.
      • 00:38:15
        At the time, we used our metro stations as kind of an anchor for the system.
      • 00:38:21
        We came to Maryfield in 2019.
      • 00:38:23
        We did some expansion in 2021.
      • 00:38:25
        in 2023 to Reston as well as the Vienna Metro in Merrifield and Tysons.
      • 00:38:31
        We came to the Franconia-Springfield Metro and surrounding neighborhoods in 2024.
      • 00:38:36
        And then of course, as you mentioned, in 2025, we expanded out to the Huntington Metro as well as the Innovation Metro.
      • 00:38:43
        And we're excited in 2026.
      • 00:38:45
        We're gonna have some additional expansion out to some new neighborhoods which we've not been to before.
      • 00:38:50
        Annandale, Bailey's Crossroads, Bellevue, Mount Vernon Trail, North King's Highway, as well as along I-66 and Merrifield and all the way out here to Fairfax Center.
      • 00:39:02
        Just wanted to share some goals and ridership.
      • 00:39:04
        And so one of the documents that has kind of guided our expansion over the years has been a Fairfax County, George Mason University, City of Fairfax, and Town of Vienna bike share study that was completed several years ago.
      • 00:39:18
        And the outcomes of that have mostly been achieved.
      • 00:39:20
        And so we've expanded out to George Mason University.
      • 00:39:23
        Our neighbors here in the City of Fairfax have added stations.
      • 00:39:27
        And of course, we've added our own stations as a result of that study.
      • 00:39:32
        The Town of Vienna is hoping to expand to the Town of Vienna as well in 2026.
      • 00:39:39
        One of the goals that we had, a kind of informal goal, was we wanted to expand all 13 metro rail stations, which we achieved in 2025.
      • 00:39:48
        And I also have some notes here about the ridership.
      • 00:39:52
        So our ridership growth slowed a bit in 2025.
      • 00:39:55
        We did a August fair change, and the good news is it resulted in a much higher revenue, but the ridership has flatlined a little bit.
      • 00:40:06
        And this does mirror kind of our regional trends as well, trends in our neighboring jurisdictions.
      • 00:40:14
        Our August ridership also hit an all-time high of almost 5,000 trips.
      • 00:40:23
        So additional facts and figures, one of the things we found is that our electric bikes are very popular among our riders.
      • 00:40:29
        And so they make up about half of our trips, but they're only 70% of our fleet in 2025.
      • 00:40:34
        Since 2022, we've acquired 215 electric bikes, 39 classics.
      • 00:40:40
        I also have a chart here that shows how our membership has been rising.
      • 00:40:45
        And so while our annual membership has declined as a percentage of overall membership, our equity members and our corporate members, so companies who've signed up for the system and given their employees discounts for membership have increased quite a bit and whatnot.
      • 00:41:04
        And then about half of our trips, 51% are casual riders,
      • 00:41:09
        Single trips, we like those because they typically pay more for their trips.
      • 00:41:15
        Our average trip time was about 19 minutes for our classic bikes, 15 minutes for electric bikes, and then I've also got a little chart here to show our top 10 busiest stations in the last year, last calendar year.
      • 00:41:26
        So our metro stations are doing quite well, as well as some of our locations in Merrifield and Ruston Town Center.
      • 00:41:39
        And then just want to share how the system is funded.
      • 00:41:44
        So our operating and maintenance costs are covered by our CNI, our Commercial and Industrial Fund.
      • 00:41:49
        We spent approximately $1.27 million on operating maintenance costs in 2025.
      • 00:41:56
        And we also had just under about a quarter million dollars in fair revenue.
      • 00:42:00
        It's roughly 70% fair box recovery ratio.
      • 00:42:04
        We do expect that the fare change from August is going to drive that ratio up a little bit.
      • 00:42:10
        And then if you're curious about our electric bikes and how that impacts the equation in terms of our cost, almost all of those charges are covered by riders.
      • 00:42:19
        So each rider has to pay at least 15 cents a minute if you're a member and 35 cents a minute if you're an annual member, or excuse me, if you're a casual rider, to use the electric bikes.
      • 00:42:31
        And then kind of the opposite of since
      • 00:42:34
        of what our operating costs are covered by.
      • 00:42:37
        Our capital costs have mostly been covered by grants, and so about two-thirds of it has been covered by our federal grants, and another third has been covered by our friends over at Northern Virginia Transportation Commission, the then Tyson's Partnership, now the Tyson's Community Alliance.
      • 00:42:51
        And there's very little bit that we've used for local funds to cover capital costs.
      • 00:42:59
        And then if you're curious how we install stations and how we find locations, we use two sets of criteria.
      • 00:43:07
        One is technical criteria.
      • 00:43:09
        So this is, for example, that the stations are solar powered.
      • 00:43:11
        They need four hours of south-facing sun.
      • 00:43:15
        And then there's also some programmatic criteria.
      • 00:43:17
        And what we've tried to categorize our stations in using a topology.
      • 00:43:22
        And so we have mixed-use apartments are usually very popular.
      • 00:43:25
        Our office locations are not quite as popular anymore.
      • 00:43:27
        We have transit locations.
      • 00:43:29
        A handful of recreational ones and a lot of residential ones.
      • 00:43:33
        In terms of equity, our Capital Bike Share for All program provides a $5 annual membership for qualifying low-income riders.
      • 00:43:39
        So instead of paying $120 a year, they pay just $5.
      • 00:43:43
        They also get a $40 a month credit towards electric bikes, as well as other charges of the program, and they get unlimited 60-minute rides on our classic bikes.
      • 00:43:54
        In terms of equity and training station locations, we each have a dedicated earmark
      • 00:43:59
        for adding Capital Bike Share stations to underserved areas.
      • 00:44:01
        So that's one of the reasons why we're going out to Annandale and Bailies Crossroads and Colmore and those neighborhoods, Seven Corners.
      • 00:44:09
        We also have another grant that's going to add stations along with 66, I-66 from NVTC.
      • 00:44:16
        We included a low-income apartment building as one of the low locations where we want to put a station.
      • 00:44:22
        And then one of the kind of interesting things about Capital Bike Share compared to most other transportation projects
      • 00:44:29
        As you can move them around, much like you have a bus line.
      • 00:44:32
        So it's certainly not the easiest process.
      • 00:44:35
        But when we find locations that aren't performing to expectations, we'll work to move them to new locations.
      • 00:44:44
        And of course, we'll take equity into account for that.
      • 00:44:50
        And so one of the reasons we're here is we want to talk to you about the future of capital bike share in Fairfax County.
      • 00:44:56
        So one of the things we've begun doing is we've begun drafting the capital bike share development plan.
      • 00:45:02
        Our first, it's modeled after some neighboring jurisdictions who have them and will kind of guide expansion investment for the next five to 10 years.
      • 00:45:11
        So we'll look at things like neighborhoods where we plan to add higher density.
      • 00:45:17
        We'll look at places of equity locations.
      • 00:45:19
        We'll look at transit locations.
      • 00:45:21
        For example, one is, I'm sure, sure, one of our biggest is, of course, is the Richmond Highway, Bus, and River Transit.
      • 00:45:27
        And the one, we have identified locations within the design to put bike share stations and whatnot.
      • 00:45:35
        And then we also want to incorporate some lessons learned from our 2026 expansion.
      • 00:45:39
        I want to incorporate some newer technology.
      • 00:45:42
        So I've got a picture here on the right of a pillar style dock.
      • 00:45:45
        It's a smaller station.
      • 00:45:47
        It's a little bit cheaper than the technology we used in the past.
      • 00:45:52
        And I've also got a picture of our electric bikes as well as a new model of a classic bike.
      • 00:45:58
        The plan also will likely identify funding for new equipment as well as replacing old equipment.
      • 00:46:05
        Some of our old equipment is about 10 years old and typically you want to place it at the 10, 12 year old range.
      • 00:46:11
        And again, as I mentioned before, almost all of our equipment was previously funded by federal grants and VTC and the Tysons Partnership, now known as Tysons Community Alliance.
      • 00:46:21
        And of course we'll do public outreach to support this planned development later this year.
      • 00:46:28
        And so last, but certainly not least, we'd like to ask two questions of the board.
      • 00:46:34
        What factors should we consider for our next five to 10 years of expansion?
      • 00:46:38
        And what funding sources should we consider to fund future operations and capital requirements?
      • James N. Bierman Jr.Member, Board of Supervisors
      • 00:46:46
        Great, thank you.
      • 00:46:48
        I saw Supervisor Palchik's hand go, so she gets to go first and then Supervisor Jimenez and Supervisor Lusk.
      • 00:46:55
        Go ahead.
      • Dalia A. PalchikMember, Board of Supervisors
      • 00:46:55
        Thank you, Mr. Chairman.
      • 00:46:57
        I get to spend a lot of time with Zack talking about Capital Bike Share.
      • 00:46:59
        It's one of my passions, so appreciate it.
      • 00:47:02
        I realized I was in D.C. when it just started and got to use it there.
      • 00:47:06
        So now e-bikes, I think, have absolutely changed the game for a lot of us, especially here where we have longer distances.
      • 00:47:13
        So I have a couple of questions and then
      • 00:47:15
        A couple of thoughts on the feedback you are requesting.
      • 00:47:18
        And this might be for later, but I think it's important to understand, I don't think you shared it, the average trip length that riders are using to get around, because I think that makes a big difference understanding where we put them.
      • 00:47:34
        What are our rates for the Capital Bike Share cabbie for all?
      • 00:47:37
        I don't know if you have that or if you can get back to us with that.
      • SPEAKER_03
      • 00:47:41
        Yep, yeah.
      • 00:47:43
        I'm going to start with average trip length.
      • 00:47:44
        So the average trip length for electric bikes is approximately 2.2 miles.
      • 00:47:50
        For classic bikes, it's a little more difficult to calculate that because they don't have GPS.
      • 00:47:55
        And so we can kind of guess based on time.
      • 00:47:58
        But there's not really an accurate way to define that.
      • Dalia A. PalchikMember, Board of Supervisors
      • 00:48:00
        You know, that makes sense.
      • 00:48:01
        I think it's about my average trip length as well.
      • 00:48:04
        And I appreciate, I think some of the older bikes, I've had a lot of broken ones.
      • 00:48:09
        And so I think it's important to make sure that the equipment continues to be updated and that we shift to electric as much as possible.
      • 00:48:17
        My other thing, as you're talking about specific factors, I don't know if this is what you mean.
      • 00:48:21
        I know we had a conversation around what is the policy, right?
      • 00:48:24
        What is our plan?
      • 00:48:25
        Thanks for rolling out because I know every time I'm looking at a land use application
      • 00:48:31
        And I'm like, let's get some bike share, but let's understand, right?
      • 00:48:34
        Where it makes sense, how we expand the network, knowing that 2.2 miles is the average for the e-bikes, I think that's important.
      • 00:48:42
        And for me, it would be, let's try to make sure we can continue to invest in that and to look at partnerships either through, because it's not a very, very high cost, right?
      • 00:48:54
        So getting the stations in, moving them, I know we've done a few of those, it's not easy,
      • 00:48:59
        does give that flexibility to be able to respond to ridership, to trends, and to the data.
      • 00:49:04
        So that's the other thing I love about the e-bikes is they do give you all of that data.
      • 00:49:09
        And I think you can see it in Dunloring.
      • 00:49:11
        I assume people use it like I do to do kind of last mile, last two miles, and get to their final destination when they're using transit.
      • 00:49:20
        And then finally, I would just say, yeah, I mean, it is pretty low.
      • 00:49:24
        So as we talk about different funding opportunities,
      • 00:49:27
        You know, I think if you look at us compared to some of the other, to Arlington and DC, we're not quite at the place where we need to be.
      • 00:49:35
        So I think every single time we can add more stations, it just will make it more of a convenience, right, rather than a nice to have inconvenience for our riders, especially those who don't have or are trying to reduce the time they spend in a car.
      • 00:49:51
        And so finally with that, as you look at where to put them,
      • 00:49:57
        I guess I'm just curious because we have for the e-bikes more data as to where they are parked, which often is not in a dock, are you able to look at where bikes are starting and ending to understand where riders are looking for more access to those e-bikes?
      • SPEAKER_03
      • 00:50:17
        We have the data.
      • 00:50:19
        Not a huge portion of our trips end outside of a dock.
      • 00:50:22
        I think it's like 5 or 10 percent.
      • 00:50:24
        So if you want to leave your bike outside the dock, if you're not aware, it's a $2 charge if you're a member, a $3 charge if you're not a member.
      • 00:50:32
        And so it allows you to leave the bike outside of a station and whatnot.
      • 00:50:35
        So it's a good way to kind of expand the network without having an actual station there and whatnot.
      • 00:50:41
        But I can get back to you.
      • Dalia A. PalchikMember, Board of Supervisors
      • 00:50:42
        Yeah, because I think whether it's looking not just at metro, but at bus stops and at places where I've seen, especially along big corridors like 29, a lot of bikes being left.
      • 00:50:52
        And I know that there are some large apartment buildings.
      • 00:50:54
        It probably means we should
      • 00:50:56
        try to be you know strategic around that rather than hey where do we want to where does it sound nice right but let's try to be strategic around where we think we can do that so very exciting I think this is really a low-cost barrier and as we build more protected lanes as well in my 20s I would have gone on some of these routes that I will not go on today and will not allow my daughter to go on so I think the more we can
      • 00:51:22
        tie together safe routes, protected lanes especially, and a capital bike share based on the data is what I think we should really focus on.
      • 00:51:31
        But thank you for your work.
      • 00:51:33
        Thank you, Laura, for coming in and leading this.
      • 00:51:34
        I'm very excited and hope we continue to expand in the five to ten years to come.
      • James N. Bierman Jr.Member, Board of Supervisors
      • 00:51:38
        Thank you.
      • 00:51:39
        Thank you.
      • 00:51:40
        Supervisor Lusk?
      • SPEAKER_03
      • 00:51:43
        Okay.
      • James N. Bierman Jr.Member, Board of Supervisors
      • 00:51:45
        Sorry, Supervisor Jimenez, then Supervisor Lusk.
      • 00:51:47
        My bad.
      • Andres F. JimenezMember, Board of Supervisors
      • 00:51:48
        Thank you, Mr. Chairman, and thank you for the presentation.
      • 00:51:51
        We're excited at Mason District where you've got 14 bike shares coming in 2026.
      • 00:51:56
        So we're really looking forward to that.
      • 00:51:58
        One question on the Annandale sites.
      • 00:52:02
        They seem to be more isolated than other sites when it comes to where they're at.
      • 00:52:09
        Historically, how did those isolated sites do and is there any plans on trying to bring them closer to the rest of the network so that there's more usage of those bike shares?
      • SPEAKER_03
      • 00:52:23
        Thank you for the question.
      • 00:52:24
        At the moment, there aren't any plans to fill the gaps between those stations and the rest of the network.
      • 00:52:31
        When we were doing our public input, one of the feedback I got was, why aren't you putting them in Annandale?
      • 00:52:38
        Annandale's this very important, dense, very diverse neighborhood, of course.
      • 00:52:44
        And the grant is for equity, or for underserved areas, excuse me.
      • 00:52:49
        And so the feedback changed my assumption of where it would work.
      • 00:52:58
        And so that's why it's in the expansion plan now.
      • 00:53:02
        And yeah, initially, having looked at it, the isolation was a little bit concerning.
      • 00:53:07
        But we're gonna see if it works, and I think it will.
      • 00:53:10
        I think there's a lot of density there.
      • 00:53:11
        We've got some other projects planned there as well.
      • James N. Bierman Jr.Member, Board of Supervisors
      • 00:53:14
        And we'll see how it performs.
      • SPEAKER_03
      • 00:53:17
        And I will say one location that was also a little bit more isolated was around, in the Superisor Lusk district around the Franconia-Springfield metro.
      • 00:53:24
        And I was actually pleasantly surprised about how much ridership I saw compared to what I, what, compared to my expectations.
      • Andres F. JimenezMember, Board of Supervisors
      • 00:53:32
        Yeah, I guess we'll wait for the numbers to come out, so we're looking forward to obviously having those 14 new sites in Mason, so thank you.
      • 00:53:39
        Thank you.
      • 00:53:40
        Supervisor Lusk.
      • Rodney L. LuskMember, Board of Supervisors
      • 00:53:41
        Yes, first a comment, and I'll say I'm really delighted to see the effort around the Bus Rapid Transit project.
      • 00:53:50
        I know that's in the future, but making sure that we have ways to help people access that improvement, because we're making a pretty significant investment there.
      • 00:54:00
        I'm also thinking about the safety concerns.
      • 00:54:02
        So I know just from a pedestrian standpoint how difficult it is along Richmond Highway and then also thinking about those who might be traveling to get to the transit station.
      • 00:54:15
        So making sure that we are building in those safety elements so that those bicyclists don't encounter significant issues.
      • 00:54:27
        And then one of the questions that I've heard about the abandoned bikes and kind of understanding what's the process in terms of and procedure when someone doesn't dock in the docking station, the bike is left somewhere else, what's the procedure to get that back to the docking station and the timeline for that?
      • SPEAKER_03
      • 00:54:49
        Yes, so we have red bikes that are always supposed to be at a station.
      • 00:54:54
        And so if they're ever not inside a station, our contractor will go out and collect them.
      • 00:54:58
        We get feedback from various locations.
      • 00:55:01
        Hey, there's a red bike here.
      • 00:55:02
        It's not super common out here.
      • 00:55:04
        And then in terms of electric bikes, when someone leaves them outside a station, it's usually there for a week or two, depending on how quickly our contractor can go out and get and retrieve it.
      • 00:55:16
        Sometimes residents will end up going in and grabbing it and riding it away.
      • 00:55:19
        So that's the ideal solution.
      • 00:55:22
        But if not, they'll go out and retrieve it and whatnot.
      • 00:55:25
        And we do have a new operating contract that we're going to be negotiating and trying to fine tune a more manageable mechanism.
      • 00:55:32
        That is something I'd like to consider.
      • Rodney L. LuskMember, Board of Supervisors
      • 00:55:35
        And just thinking about the maintenance of the bicycles, what's the process for that in terms of ensuring the bikes are in good working condition?
      • SPEAKER_03
      • 00:55:47
        Yep, so our operating contractor, Lyft, has a warehouse in D.C. and I think there's also one in Maryland where they take the bikes back and if there's issues with them, they'll fix them, they'll inspect them from time to time as well.
      • 00:56:02
        They also have staff that actually rove around on bikes with pumps and they can do small maintenance at our stations as well and whatnot.
      • 00:56:11
        And then of course if you're riding the bike and you notice there's an issue with it you can either when you dock it or when you end your trip on an electric bike outside a station you can report you know issues and that's that's one of the key ways that we hear from folks so the station themselves have a little little wrench button you press that and they'll know to come out and check and it will prevent people from using that bike until they've done that.
      • James N. Bierman Jr.Member, Board of Supervisors
      • 00:56:33
        Thank you Supervisor Sizemore Heizer.
      • Rachna Sizemore HeizerMember, Board of Supervisors
      • 00:56:36
        Just really quickly, I really appreciate the presentation.
      • 00:56:39
        And I'm just wondering if you've thought about bike share near NOVA, the campus, in terms of the equity factor, getting some of the students connected to either major bus lines or to the metro.
      • 00:56:50
        But I know GMU has bike share, but I don't think NOVA does.
      • 00:56:54
        So I just wanted to bring that to your attention.
      • SPEAKER_03
      • 00:56:56
        Thank you.
      • Rachna Sizemore HeizerMember, Board of Supervisors
      • 00:56:57
        Yes, you're talking about the NOVA
      • 00:56:59
        Annandale Campus, I have both GMU and NOVA in my district.
      • 00:57:04
        It seems to be a higher ed district.
      • 00:57:06
        I think they're all smart districts.
      • 00:57:14
        But I do think, especially potentially the demographics of the students who go to Mason, they may have some lower income, they probably are more likely to be residents of our county, and helping them connect to major bus lines to go to work or to Metro may be helpful, so I just want to bring that to your attention.
      • SPEAKER_03
      • 00:57:29
        Okay, yeah, thank you.
      • 00:57:30
        We not consider Nova Campus Annandale because there weren't a lot of housing nearby, but as time goes by, we certainly consider that.
      • 00:57:40
        And I'll just note that the reason George Mason has stations is because they actually pay, they sponsor them.
      • Rachna Sizemore HeizerMember, Board of Supervisors
      • 00:57:45
        Absolutely.
      • SPEAKER_03
      • 00:57:46
        And so they, yeah, so that's why they have them on their campus.
      • Rachna Sizemore HeizerMember, Board of Supervisors
      • 00:57:51
        That makes sense, thank you.
      • James N. Bierman Jr.Member, Board of Supervisors
      • 00:57:53
        Thank you, Supervisor Stork.
      • Daniel G. StorckMember, Board of Supervisors
      • 00:57:56
        Thank you, Mr. Chairman.
      • 00:57:58
        And I'm sorry if I didn't hear some of this.
      • 00:58:01
        You have a soft voice.
      • 00:58:02
        You talk quickly.
      • 00:58:03
        And so anyways, my question is maybe the broader question.
      • 00:58:11
        We had a conversation many, many years ago about whether or not capital bike shares was maybe the approach to go.
      • 00:58:18
        And I know transportation was deeply committed to that.
      • 00:58:21
        I mean, Tom Bishani, that was his thing.
      • 00:58:25
        But I've always been
      • 00:58:27
        More cautious about
      • 00:58:48
        how this model in particular has rolled out.
      • 00:58:51
        I assume that others are ahead of maybe where we are at D.C. particularly.
      • 00:58:56
        So is there any kind of utilization experiences that we've seen elsewhere with particular models and beyond capital bank shares or is there, I mean that's the broader question.
      • 00:59:10
        And then ultimately the issue for me is
      • 00:59:13
        Utilization and that utilization then ties only to the cost of the fare box recovery percentages and so forth.
      • SPEAKER_03
      • 00:59:26
        Yes, so are there other parts of the U.S. like city bike in New York is for example.
      • Daniel G. StorckMember, Board of Supervisors
      • 00:59:32
        And if you could, if you could slow down just a little bit for me and talk a little bit more directly into the mic that would be very, very helpful to me.
      • 00:59:38
        Thank you.
      • SPEAKER_03
      • 00:59:39
        Yeah, thank you for bringing that to my attention.
      • 00:59:44
        So, other bike share models in other cities will rely on, for example, exclusively private funding.
      • 00:59:50
        So, for example, New York City's Citi Bike has a sponsor, Citibank, that helps defray that cost, but a lot of that cost is borne by the riders, and so it's one of the most expensive, although most popular, systems in the U.S. to ride.
      • 01:00:05
        And so that's one model.
      • 01:00:07
        In our region, though, we have always been a publicly owned and mostly publicly funded model and whatnot.
      • 01:00:15
        And so we are always looking for ways to offset the cost.
      • 01:00:21
        So for example, getting a sponsor like Citibank to sponsor our system and help us reduce the cost is something we've longed.
      • 01:00:30
        We have a contractor in the field going and having those conversations, but it's a long process to get a sponsor on board.
      • Daniel G. StorckMember, Board of Supervisors
      • 01:00:39
        So I heard New York City, any sense of the fair box recovery portion of that?
      • 01:00:44
        And then are there any others that we've looked at, you've looked at around the country, and anything else that we could use to maybe either improve our model or to maybe do some kind of a hybrid that wouldn't be so dependent upon a specific location being set up?
      • 01:01:00
        And obviously, the capital costs of that are much higher than something that's more flexible and, if you will, more entrepreneurial.
      • SPEAKER_03
      • 01:01:10
        Um, yeah, I mean, one of the, I mean, when we first started the system and we only had red bikes that could go to stations and that was, that was the only place you could go.
      • 01:01:18
        Um, we do have this, the electric bikes now allow you to, to leave a bike outside of station and have that, that same kind of hybrid model.
      • 01:01:26
        A lot of places have had, Paris has that model too, although it's not similar to us, it's not extremely well utilized.
      • 01:01:35
        And then one of the newer classic bikes actually is going to offer that option as well.
      • 01:01:40
        So classic bikes wouldn't have to be tied to a station.
      • 01:01:43
        So that kind of adjusts the model a little bit compared to what we have now, having a station-based model.
      • 01:01:50
        You can have more of a hybrid model of folks being able to leave them in more places with more flexibility.
      • Daniel G. StorckMember, Board of Supervisors
      • 01:01:56
        Do we have any work or studies, anything that you all have used to come up with what we do?
      • 01:02:01
        And if so, you could take it offline, but I would appreciate having a chance to look at that.
      • 01:02:06
        And you all know Jim Klein and his
      • 01:02:09
        His deep advocacy on bicycling and pedestrian safety.
      • 01:02:15
        So anything along those lines would be helpful for me to understand if you want my ongoing support for this.
      • 01:02:21
        Thank you.
      • 01:02:22
        Thank you.
      • James N. Bierman Jr.Member, Board of Supervisors
      • 01:02:24
        Thank you, Supervisor Alcorn.
      • Walter L. AlcornMember, Board of Supervisors
      • 01:02:27
        Thank you, Mr. Chairman.
      • 01:02:28
        Jimmy.
      • 01:02:29
        So I want to try to answer the first question specific factors and building on a question or comment made by Supervisor Palchik as well.
      • 01:02:42
        You know a few years ago we were talking about alternatives to level of service.
      • 01:02:47
        We were talking about the additional measures of effectiveness that would capture multimodal, would be able to measure things like this.
      • 01:02:56
        Can we use that?
      • 01:02:57
        Where is that?
      • Gregg SteversonDirector of Transportation
      • 01:03:00
        So that's being used for our analyses.
      • 01:03:04
        The question then becomes, so a lot of the analysis is around bike safety, comfort, and that sort of thing.
      • 01:03:11
        That can give us an understanding of maybe some of the facilities where we should be expanding sidewalks or trails or bike lanes in some way, shape, or form.
      • 01:03:22
        Might be able to cross-reference it a little bit with Capital Black Share.
      • 01:03:25
        I'm not sure if it'll be a real good one-to-one, but it might give you a little bit of data to help you out.
      • Walter L. AlcornMember, Board of Supervisors
      • 01:03:30
        Yeah, I'd encourage that because I know the idea was, particularly as we have land use applications that are coming through the process, and I think that could be a source of expansion, particularly when it scores well, frankly, as one of those MOEs.
      • James N. Bierman Jr.Member, Board of Supervisors
      • 01:03:51
        OK, thank you.
      • 01:03:57
        Mr. Chairman, yes.
      • Jeffrey C. McKayChair, Board of Supervisors
      • 01:03:58
        Yeah, thank you.
      • 01:03:59
        I just want to thank you for the presentation and the work that you've done.
      • 01:04:03
        I do, on the equity piece, I appreciate that we're looking at that now.
      • 01:04:09
        I'm just wondering when that started, because obviously when you look at where these was rolled out, where these originally were rolled out, that was not, it's clear that that was not a factor and it is now.
      • 01:04:20
        So moving forward, I'm grateful that that's a criteria.
      • 01:04:23
        I don't know how long we've been applying that.
      • 01:04:26
        And related to that, you know, in some of those equity areas we do have some pretty significant good redevelopment happening and it might be useful, and I know this was mentioned earlier, to be working with the district supervisor in those areas in concert with your DPZ folks to look at those new developments coming in that can dedicate the space for this because that, you know, a lot of times is a hurdle in accomplishing this.
      • 01:04:54
        I would just say on that equity piece to be really focused on that.
      • 01:04:58
        The new e-bikes, I think, are going to be a difference maker in access and who can use these.
      • 01:05:07
        I'll never forget.
      • 01:05:08
        I thought Supervisor Alcorn was going to share this.
      • 01:05:10
        I'll never forget.
      • 01:05:11
        I think it was the first tour to Hunter Mill when Supervisor Alcorn attempted to ride
      • 01:05:19
        The tour to Hunter Mill with the heaviest Capital bike share bike known to mankind And he accomplished it at the end a much stronger person at the end of that but it's clear these bikes are intended for certain things And not ideal for other things, but I do think the e-bike piece of this opens this up to people for longer trips
      • 01:05:43
        better data but also that's a part of the equity piece too because right now you have a mode of transportation before the e-bike introduction you have a mode of transportation where a subset of the population is just not able to use it period and you know I think this is equity both in location and in access to equipment that can be used by more and more people regardless of their ability and so I would I would just
      • 01:06:09
        Look at those things and really focus on those equity pieces moving forward because I think they're going to be important.
      • James N. Bierman Jr.Member, Board of Supervisors
      • 01:06:17
        Thank you.
      • 01:06:19
        Just as a closing comment, in trying to answer the two questions as directly as possible,
      • 01:06:28
        One thing I think about, admittedly, the other day, Vice Chair Smith and I rode down to Richmond together, and I picked her up at her house in the Sully district, my second favorite district.
      • 01:06:42
        And she lives in a suburban neighborhood that looks like your classic, very, very classic suburban neighborhood.
      • 01:06:52
        They're cul-de-sacs.
      • 01:06:54
        They're houses.
      • 01:06:54
        It's highly residential.
      • 01:06:58
        Obviously this program started in cities and the question is what can we do to make this program or how would we right size it that it might ultimately be used by some suburban neighborhoods like Cathy's.
      • 01:07:13
        I also think about that in the context of looking forward, thinking about HOAs, thinking about specific apartment buildings, thinking about areas, if we're talking to either a specific apartment building or an HOA that's saying, hey, you know, we'd really love to get access to the metro, but it's really difficult.
      • 01:07:34
        We all get in our cars.
      • 01:07:36
        What if we had a capital bike share at the end of our neighborhood that we could then get to the metro on?
      • 01:07:41
        As for the second question, are there sources of funding or partnerships we should consider?
      • 01:07:46
        All I can say is that when you think of the word capital bike share and then you think of city bike in New York, we would only have to add one word for a certain partnership.
      • 01:07:57
        yes the pun was intended with that if there are no more questions we don't have anything else on the agenda and nobody I hope is bringing up new business so with that we are finally going to end one of my transportation committee meetings early thank you the meeting is adjourned